SENATE FINANCE COMMITTEE SUBSTITUTE FOR
SENATE BILL 425
57th legislature - STATE OF NEW MEXICO - first session, 2025
AN ACT
RELATING TO CAPITAL EXPENDITURES; REAUTHORIZING OR REAPPROPRIATING BALANCES, EXPANDING OR CHANGING PURPOSES, EXTENDING EXPENDITURE PERIODS, CHANGING AGENCIES AND ESTABLISHING CONDITIONS FOR THE REVERSION OR TRANSFER OF UNEXPENDED BALANCES OF APPROPRIATIONS MADE BY THE LEGISLATURE IN PRIOR YEARS; DECLARING AN EMERGENCY.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF NEW MEXICO:
SECTION 1. SEVERANCE TAX BONDS--REVERSION OF PROCEEDS.--
A. Except as otherwise provided in another section of this act:
(1) the unexpended balance from the proceeds of severance tax bonds issued for a project that has been reauthorized in this act shall revert to the severance tax bonding fund:
(a) at the end of the expenditure period as set forth in this act, if the expenditure period is changed in this act; or
(b) if the expenditure period is not changed in this act, pursuant to the time frame set forth in the law that originally authorized the severance tax bonds or the time frame set forth in any law that has previously reauthorized the expenditure of the proceeds, whichever is later; and
(2) all remaining balances from the proceeds of severance tax bonds issued for a project that has been reauthorized in this act shall revert to the severance tax bonding fund three months after the reversion date for the unexpended balances.
B. For the purpose of this section, "unexpended balance" means the remainder of an appropriation after reserving for unpaid costs and expenses covered by binding written obligations to third parties.
SECTION 2. GENERAL FUND AND OTHER FUND APPROPRIATIONS--REVERSIONS.--
A. Except as otherwise provided in another section of this act:
(1) the unexpended balance of an appropriation from the general fund or other state fund that has been changed in this act shall revert:
(a) at the end of the expenditure period as set forth in this act, if the expenditure period is changed in this act; or
(b) if the expenditure period is not changed in this act, pursuant to the time frame set forth in the law in which the original appropriation was made or the time frame set forth in any law that has previously changed the appropriation, whichever is later; and
(2) all remaining balances of an appropriation from the general fund or other state fund that has been changed in this act shall revert three months after the reversion date for the unexpended balance.
B. Except as provided in Subsection C of this section, the balance of an appropriation made from the general fund or other state fund shall revert pursuant to Subsection A of this section to the originating fund.
C. The balance of an appropriation made from the general fund or other state fund to the Indian affairs department or the aging and long-term services department for a project located on lands of an Indian nation, tribe or pueblo shall revert pursuant to Subsection A of this section to the tribal infrastructure project fund.
D. For the purpose of this section, "unexpended balance" means the remainder of an appropriation after reserving for unpaid costs and expenses covered by binding written obligations to third parties.
SECTION 3. PASEO DEL VOLCAN IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 1 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design and construct improvements to paseo del Volcan in Bernalillo and Sandoval counties is extended through fiscal year 2027.
SECTION 4. ALBUQUERQUE MESA DEL SOL EAST PLAT LIFT STATION CONSTRUCTION--CHANGE TO ALBUQUERQUE-BERNALILLO COUNTY WATER UTILITY AUTHORITY MESA DEL SOL EAST PLAT LIFT STATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of environment in Subsection 4 of Section 22 of Chapter 53 of Laws 2022 to plan, design and construct a lift station on the east plat of the Mesa del Sol economic development hub in Bernalillo county shall not be expended for the original purpose but is changed to plan, design and construct a lift station for the Albuquerque-Bernalillo county water utility authority on the east plat of the Mesa del Sol economic development hub in Bernalillo county. The time of expenditure is extended through fiscal year 2027.
SECTION 5. ARENAL ROAD SOUTHWEST IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 4 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct and rehabilitate any county-maintained road and associated infrastructure, including Arenal road from Coors boulevard west to the end of county maintenance and the intersection of Rio Bravo boulevard and Second street extending north and east, in county commission district 2 in Bernalillo county is extended through fiscal year 2027.
SECTION 6. ARMIJO ROAD SOUTHWEST ROAD AND DRAINAGE IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 4 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 52 to plan, design and construct road and drainage improvements to Armijo road SW in the South Valley area of Bernalillo county is extended through fiscal year 2027.
SECTION 7. ATRISCO VISTA BOULEVARD NORTHWEST IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 5 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design and improve Atrisco Vista boulevard from Double Eagle airport to paseo del Norte boulevard NW in Bernalillo county is extended through fiscal year 2027.
SECTION 8. BERNALILLO COUNTY DISTRICT 2 TRAFFIC CALMING INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 7 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct and install traffic calming devices, including speed humps, in county commission district 2 in Bernalillo county is extended through fiscal year 2027.
SECTION 9. BERNALILLO COUNTY FAMILY SERVICES FACILITY CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 4 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2023, Chapter 203, Section 9 to plan, design, construct, renovate, furnish, equip and landscape a family services facility in the South Valley area of Bernalillo county is extended through fiscal year 2027.
SECTION 10. BERNALILLO COUNTY MEAL DELIVERY EQUIPMENT PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 68 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2023, Chapter 203, Section 13 to purchase and install equipment, including information technology and related equipment and infrastructure, cooking equipment, white goods, appliances and storage equipment, for a homebound and special needs meal delivery program in Bernalillo county is extended through fiscal year 2027.
SECTION 11. BERNALILLO COUNTY MOUNTAINVIEW NEIGHBORHOOD DRAINAGE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 8 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct and improve drainage in cooperation with the Albuquerque metropolitan arroyo flood control authority in the Mountainview neighborhood in county commission district 2 in Bernalillo county is extended through fiscal year 2027.
SECTION 12. BERNALILLO COUNTY SOUTHWEST MESA FIRE STATION CONSTRUCTION--CHANGE TO NORTH VALLEY FIRE STATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 14 of Section 29 of Chapter 138 of Laws 2021 to acquire land and to plan, design, construct, equip and furnish phase 1 of a new fire station for the southwest mesa in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct, equip and furnish a fire station in the north valley in Bernalillo county. The time of expenditure is extended through fiscal year 2027.
SECTION 13. BERNALILLO COUNTY SOUTHERN AREA STREET LIGHT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 6 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct, improve, replace, purchase, retrofit and install street lights and related equipment in county commission district 2 in Bernalillo county is extended through fiscal year 2027.
SECTION 14. BERNALILLO COUNTY VETERANS TRANSITIONAL HOUSING FURNITURE AND EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 155 of Section 28 of Chapter 199 of Laws 2023 to purchase and install furnishings and equipment for transitional housing at the veterans integration centers in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 15. ESCARPMENT ROAD IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 10 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 21 to plan, design and construct paving and other improvements on Escarpment road on the southwest mesa in Bernalillo county is extended through fiscal year 2027.
SECTION 16. ALBUQUERQUE PLAYING FIELD IMPROVEMENT--CHANGE TO EXPO NEW MEXICO PLAYING FIELD AND SPORTS ARENA IMPROVEMENT--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--Fifty-four percent of the unexpended balance of the appropriation to the local government division originally authorized in Subsection 73 of Section 30 of Chapter 53 of Laws 2022 and reauthorized in Laws 2023, Chapter 203, Section 43 to purchase, equip, install and make improvements to playing fields, including artificial turf, throughout Albuquerque in Bernalillo county shall not be expended for the original or reauthorized purpose but is appropriated to the state fair commission to purchase, equip, install and make improvements to playing fields and sports arenas, including artificial turf, for Expo New Mexico in Bernalillo county. The time of expenditure is extended through fiscal year 2027.
SECTION 17. NEW MEXICO HIGHWAY 333 AND TABLAZON ROAD INTERSECTION IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 15 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 24 to acquire rights of way for and to plan, design and construct improvements at the intersection of Tablazon road and New Mexico highway 333, including realignment and road extension, in Bernalillo county is extended through fiscal year 2027.
SECTION 18. ALBUQUERQUE MESA DEL SOL LIFT STATION AND INFRASTRUCTURE CONSTRUCTION--CHANGE TO ALBUQUERQUE-BERNALILLO COUNTY WATER UTILITY AUTHORITY MESA DEL SOL LIFT STATION CONSTRUCTION--CHANGE AGENCY--EXTEND TIME--GENERAL FUND.--The unexpended balance of the apropriation to the local government division in Subsection 71 of Section 28 of Chapter 199 of Laws 2023 to plan, design and construct the Mesa del Sol lift station and infrastructure for fire stations, police stations and schools in Albuquerque in Bernalillo county shall not be expended for the original purpose but is appropriated to the department of environment to plan, design and construct the Mesa del Sol lift station and infrastructure for fire stations, police stations and schools for the Albuquerque-Bernalillo county water utility authority in Bernalillo county. The time of expenditure is extended through fiscal year 2027.
SECTION 19. ALBUQUERQUE MESA DEL SOL NORTH PLAT LIFT STATION CONSTRUCTION--CHANGE TO ALBUQUERQUE-BERNALILLO COUNTY WATER UTILITY AUTHORITY MESA DEL SOL NORTH PLAT LIFT STATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of environment in Subsection 5 of Section 22 of Chapter 53 of Laws 2022 to plan, design and construct a lift station in the north plat of the Mesa del Sol economic development hub in Bernalillo county shall not be expended for the original purpose but is changed to plan, design and construct a lift station for the Albuquerque-Bernalillo county water utility authority on the north plat of the Mesa del Sol economic development hub in Bernalillo county. The time of expenditure is extended through fiscal year 2027.
SECTION 20. TWELFTH STREET NORTHWEST AND SAWMILL ROAD NORTHWEST IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 14 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design, construct, equip and install traffic calming devices and pedestrian safety improvements on Twelfth street NW and Sawmill road NW in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 21. SECOND STREET NORTHWEST IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 2 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design, construct and improve Second street NW from Osuna road to Los Ranchos road, including accessibility compliance, in Bernalillo county is extended through fiscal year 2027.
SECTION 22. ALBUQUERQUE ANDERSON-ABRUZZO INTERNATIONAL BALLOON MUSEUM EXHIBITION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 21 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, purchase, furnish, equip and install exhibitions, including the balloon fiesta exhibition and an outdoor youth exhibition, at the Anderson-Abruzzo Albuquerque international balloon museum in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 23. ALBUQUERQUE NORTH FOURTH ARTS CENTER RENOVATION--CHANGE TO ARTS CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 74 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct safety and security renovations, including accessibility compliance improvements, at the north Fourth arts center in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct, equip and furnish an arts center in Albuquerque. The time of expenditure is extended through fiscal year 2027.
SECTION 24. ALBUQUERQUE FILM AND MEDIA TRAINING CENTER IMPROVEMENT--CHANGE TO ARTS CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 63 of Section 30 of Chapter 53 of Laws 2022 to purchase and install equipment and to plan, design and construct related improvements for an incubator and training center for film, digital media, theater and studio arts workers in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct, equip and furnish an arts center in Albuquerque in Bernalillo county. The time of expenditure is extended through fiscal year 2027.
SECTION 25. ALBUQUERQUE ASIAN AND PACIFIC ISLANDER COMMUNITY CENTER CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 31 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2020, Chapter 82, Section 12 and reauthorized again in Laws 2023, Chapter 203, Section 38 to plan, design and construct a city-owned community center inclusive of the cultural needs of the Asian and Pacific Islander population in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 26. ALBUQUERQUE CANDELARIA NATURE PRESERVE RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 28 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct and renovate the Candelaria nature preserve in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 27. ALBUQUERQUE COMMUNITY KITCHEN CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 33 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, renovate and equip a building as a restaurant incubator and community kitchen in the Barelas metropolitan redevelopment area in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 28. ALBUQUERQUE DANIEL WEBSTER PARK RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 35 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct and renovate Daniel Webster park, including accessibility and infrastructure improvements, in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 29. ALBUQUERQUE INTERNATIONAL DISTRICT METROPOLITAN REDEVELOPMENT AREA DEVELOPMENT--CHANGE TO DENTAL HEALTH SERVICES PROGRAM EQUIPMENT PURCHASE--GENERAL FUND.--Up to one million four hundred eighty-five thousand dollars ($1,485,000) of the unexpended balance of the appropriation to the local government division in Subsection 74 of Section 28 of Chapter 199 of Laws 2023 to acquire land and property for and to plan, design, construct, equip and improve the central/ highland/upper Nob Hill metropolitan development area, including infrastructure and facilities, in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to purchase equipment and to equip a dental health services program providing health services to the unhoused, including medical equipment, furnishings and fixtures, in Albuquerque in Bernalillo county.
SECTION 30. ALBUQUERQUE DISPLACED PERSONS TRANSPORTATION SERVICES VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 56 of Section 28 of Chapter 199 of Laws 2023 to purchase equipment and vehicles to provide transportation and meal services to displaced persons and families experiencing homelessness in the international district in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 31. ALBUQUERQUE EMERGENCY FOOD DISTRIBUTION EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 60 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip tractors, trailers, forklifts, forklift batteries and pallet jacks and racking for emergency food storage and distribution for Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 32. ALBUQUERQUE EMERGENCY FOOD DISTRIBUTION PROGRAM VEHICLE PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 42 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2023, Chapter 203, Section 33 to purchase vehicles and equipment for use by a food bank emergency food distribution program in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 33. ALBUQUERQUE FIRE RESCUE EMERGENCY MEDICAL RESPONSE EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 65 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip emergency medical response equipment, including chest compression system devices, gurneys and extrication equipment, in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 34. ALBUQUERQUE FIRE RESCUE VEHICLE PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 50 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2023, Chapter 203, Section 34 to purchase and equip fire department vehicles for Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 35. ALBUQUERQUE FOOD BUSINESS INCUBATOR CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 63 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 36 to acquire land for and to plan, design, construct, furnish, equip and install equipment for a commercial kitchen and food business incubator in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 36. ALBUQUERQUE GENOCIDE AND INTOLERANCE MUSEUM RENOVATION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division originally authorized in Subsection 66 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 37 to plan, design, construct and renovate a facility for the Holocaust and Intolerance museum in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 37. ALBUQUERQUE SURGICAL CENTER CONSTRUCTION--CHANGE TO HEALTH CARE DATA SYSTEMS INFORMATION TECHNOLOGY PURCHASE--GENERAL FUND.--Two hundred fifty thousand dollars ($250,000) of the unexpended balance of the appropriation to the local government division originally authorized in Subsection 106 of Section 28 of Chapter 199 of Laws 2023 and reauthorized in Laws 2024, Chapter 65, Section 30 to plan, design, construct, acquire, furnish and equip a surgical center for a clinically integrated health care network in Albuquerque in Bernalillo county shall not be expended for the original or reauthorized purpose but is changed to purchase, equip, furnish and install information technology for health care data systems in Albuquerque in Bernalillo county.
SECTION 38. ALBUQUERQUE LADDER TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 80 of Section 28 of Chapter 199 of Laws 2023 to purchase, equip and replace ladder trucks for Albuquerque fire rescue station 7 in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 39. ALBUQUERQUE LOMAS TRAMWAY LIBRARY IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 63 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, replace, equip and install improvements to the roof and the heating, ventilation and air conditioning systems at the Lomas Tramway library in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 40. ALBUQUERQUE GEORGE J. MALOOF MEMORIAL AIR PARK IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 65 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct improvements at the George J. Maloof memorial air park in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 41. ALBUQUERQUE MEDIAN LANDSCAPING CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 17 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct and improve median landscaping along streets in city council district 3 in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 42. ALBUQUERQUE MOBILE HOMELESS FACILITY AND VEHICLE PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 70 of Section 29 of Chapter 138 of Laws 2021 to purchase and equip mobile facilities and vehicles, including shower units and soup kitchens, for the homeless community in the international district and surrounding areas in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 43. ALBUQUERQUE NEW MEXICO VETERANS' MEMORIAL PARK RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 77 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, renovate and equip a New Mexico veterans' memorial park in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 44. ALBUQUERQUE NORTHWEST MESA FIRE STATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 49 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2023, Chapter 203, Section 35 to plan, design and construct a fire station on the northwest mesa in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 45. ALBUQUERQUE PERFORMING AND VISUAL ARTS EDUCATION CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 80 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct and renovate buildings and grounds, including site preparation and the purchase and installation of fencing, infrastructure and related equipment, at a public performing, visual arts and education center in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 46. ALBUQUERQUE DOMESTIC VIOLENCE COUNSELING OFFICE ACQUISITION--CHANGE TO ALBUQUERQUE POLICE DEPARTMENT FAMILY ADVOCACY CENTER RENOVATION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 57 of Section 28 of Chapter 199 of Laws 2023 to acquire property, including a building in which domestic violence counselors can work with victims, in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, equip and furnish the police department family advocacy center in Albuquerque. The time of expenditure is extended through fiscal year 2027.
SECTION 47. ALBUQUERQUE ROUTE 66 SIGNAGE CONSTRUCTION--CHANGE TO ROUTE 66 CENTRAL AVENUE SIGNAGE AND LIGHTING IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division originally authorized in Subsection 107 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 39 to plan, design, construct and install route 66 signage at the Central avenue and Lomas boulevard intersection area in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct and install route 66 signage and lighting along Central avenue in Albuquerque in Bernalillo county. The time of expenditure is extended through fiscal year 2027.
SECTION 48. BERNALILLO COUNTY SOUTH VALLEY LIBRARY FURNITURE PURCHASE--CHANGE TO ALBUQUERQUE SOUTH VALLEY LIBRARY FURNITURE PURCHASE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 24 of Section 28 of Chapter 199 of Laws 2023 to purchase and replace furniture at the South Valley library in Bernalillo county shall not be expended for the original purpose but is changed to purchase and replace furniture at the South Valley library in Albuquerque in Bernalillo county. The time of expenditure is extended through fiscal year 2027.
SECTION 49. ALBUQUERQUE SAN ANTONIO DRIVE MEDIAN STUDY PLAN--CHANGE TO MEDIAN IMPROVEMENT--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 166 of Section 28 of Chapter 66 of Laws 2024 for a feasibility study to convert medians along San Antonio drive into linear parks or greenways in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct, renovate and improve medians along San Antonio drive in Albuquerque.
SECTION 50. ALBUQUERQUE SAWMILL OLD TOWN PEDESTRIAN STREETS IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 93 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct and improve pedestrian streets, including utility relocation, lighting and signage, in the Sawmill and Old Town areas of Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 51. ALBUQUERQUE SAWMILL COMMUNITY LAND TRUST PLAZA RENOVATION--CHANGE TO SAWMILL RAIL TRAIL CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 123 of Section 30 of Chapter 53 of Laws 2022 to plan, design, construct and renovate the plaza on the Sawmill community land trust in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct, furnish and equip the Sawmill rail trail. The time of expenditure is extended through fiscal year 2027.
SECTION 52. ALBUQUERQUE SOUTHWEST MESA STREET LIGHTS CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 23 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 41 to plan, design, construct, equip and install street lights for the southwest mesa area in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 53. ALBUQUERQUE STREET LIGHT INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 16 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct and install street lights for city council district 3 in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 54. ALBUQUERQUE SUICIDE MEMORIAL CONSTRUCTION--CHANGE TO SUICIDE PREVENTION INFORMATION PORTAL CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 126 of Section 28 of Chapter 199 of Laws 2023 to plan, design and construct a memorial for victims of suicide in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design and construct suicide prevention information portals citywide, including in city parks, in Albuquerque in Bernalillo county.
SECTION 55. ALBUQUERQUE TONY HILLERMAN LIBRARY SECURITY SYSTEM INSTALLATION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 131 of Section 28 of Chapter 199 of Laws 2023 to purchase and install security systems, including fire and burglary systems and cameras, at the Tony Hillerman library in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 56. ALBUQUERQUE TRUMBULL PARK RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 103 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct and replace playground equipment at Trumbull park in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 57. ALBUQUERQUE TURF PLAYING FIELDS IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 24 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2023, Chapter 203, Section 42 to purchase, equip, install and make improvements to playing fields, including artificial turf, throughout Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 58. ALBUQUERQUE VISITOR CENTER IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 90 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, improve, equip and furnish a visitor center and multi-use trail along west Central avenue in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 59. WEST MESA BASEBALL FACILITY IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 119 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, install, purchase and equip improvements, including concessions, office, bathrooms, plumbing, electrical, security systems, overhead shade, fencing repairs, wind and glare screens and turf, and to comply with accessibility requirements and with the guidelines of the federal centers for disease control and prevention at fields used by the West Mesa little league in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 60. ALBUQUERQUE WESTSIDE ANIMAL SHELTER RENOVATION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 141 of Section 28 of Chapter 199 of Laws 2023 to plan, design, construct, improve and expand the Westside animal shelter, including kennels, associated support facilities, offices, public areas and a veterinary clinic, in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 61. ALBUQUERQUE YOUTH EDUCATION PROGRAM INFORMATION TECHNOLOGY AND VEHICLE PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 110 of Section 29 of Chapter 138 of Laws 2021 to purchase and install information technology and related equipment and vehicles for a youth education program in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 62. ALBUQUERQUE YOUTH TEMPORARY HOUSING FACILITY RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 111 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, replace, renovate, purchase and equip a facility to provide temporary housing for youth in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 63. ALBUQUERQUE-BERNALILLO COUNTY WATER UTILITY AUTHORITY WINROCK WASTEWATER RECLAMATION SYSTEM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project originally authorized in Subsection 4 of Section 26 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 51 to plan, design, construct, permit and equip a wastewater reuse system for the Albuquerque-Bernalillo county water utility authority to provide reclaimed water to the Winrock site and to public parks in Albuquerque is extended through fiscal year 2027.
SECTION 64. ALBUQUERQUE-BERNALILLO COUNTY WATER UTILITY AUTHORITY WINROCK WASTEWATER REUSE SYSTEM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project originally authorized in Subsection 3 of Section 26 of Chapter 81 of Laws 2020 and reauthorized in Laws 2023, Chapter 203, Section 50 to plan, design, construct, permit and equip a wastewater reuse system for the Albuquerque-Bernalillo county water utility authority to provide reclaimed water to the Winrock site and to public parks in Albuquerque is extended through fiscal year 2027.
SECTION 65. BARCELONA ROAD SOUTHWEST IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 19 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct and improve Barcelona road SW from west of Sylvia road to the Isleta drain, including drainage, in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 66. ALBUQUERQUE WORKFORCE DEVELOPMENT CENTER MODULAR BUILDING CONSTRUCTION--CHANGE TO BERNALILLO COUNTY WORKFORCE DEVELOPMENT CENTER RENOVATION--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division originally authorized in Subsection 43 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2023, Chapter 203, Section 7 to plan, design, construct, purchase, deliver, renovate, furnish, equip and install a modular building for an education and workforce development center in Bernalillo county shall not be expended for the original or reauthorized purpose but is appropriated to the economic development department to plan, design, construct, renovate, equip and furnish an education and workforce development center for low-income Spanish speakers in Bernalillo county. The time of expenditure is extended through fiscal year 2027.
SECTION 67. ALBUQUERQUE WORKFORCE DEVELOPMENT CENTER MODULAR BUILDING PURCHASE--CHANGE TO BERNALILLO COUNTY WORKFORCE DEVELOPMENT CENTER RENOVATION--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division originally authorized in Subsection 60 of Section 30 of Chapter 53 of Laws 2022 and reauthorized in Laws 2023, Chapter 203, Section 8 to plan, design, construct, purchase, deliver, renovate, furnish, equip and install a modular building for an education and workforce development center in Bernalillo county shall not be expended for the original or reauthorized purpose but is appropriated to the economic development department to plan, design, construct, renovate, equip and furnish an education and workforce development center for low-income Spanish speakers in Bernalillo county. The time of expenditure is extended through fiscal year 2027.
SECTION 68. BERNALILLO COUNTY EDUCATION AND WORKFORCE DEVELOPMENT CENTER MODULAR BUILDING CONSTRUCTION--CHANGE TO WORKFORCE DEVELOPMENT CENTER RENOVATION--CHANGE AGENCY--EXTEND TIME.--The unexpended balance of the appropriation to the local government division in Subsection 7 of Section 28 of Chapter 199 of Laws 2023 to plan, design, construct, renovate, purchase, deliver, install, furnish and equip a modular building for an education and workforce development center in Bernalillo county shall not be expended for the original purpose but is appropriated to the economic development department to plan, design, construct, renovate, equip and furnish an education and workforce development center for low-income Spanish speakers in Albuquerque in Bernalillo county. The time of expenditure is extended through fiscal year 2027.
SECTION 69. BERNALILLO COUNTY MOUNTAINVIEW SIDEWALK CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 7 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 14 to acquire rights of way and to plan, design and construct sidewalks and drainage infrastructure in the Mountainview area, including Prince street and Prosperity avenue, in Bernalillo county is extended through fiscal year 2027.
SECTION 70. BERNALILLO COUNTY NORTHEAST AREA SHERIFF SUBSTATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 9 of Section 29 of Chapter 138 of Laws 2021 to acquire land and to plan, design and construct a sheriff substation in county commission district 4 in Bernalillo county is extended through fiscal year 2027.
SECTION 71. BERNALILLO COUNTY PARADISE HILLS COMMUNITY CENTER IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 7 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 54 to plan, design, construct, equip and furnish phase 2 improvements in the Paradise Hills community center in Bernalillo county is extended through fiscal year 2027.
SECTION 72. BRIDGE BOULEVARD PHASE TWO BUS SHELTERS AND MEDIAN ART CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 9 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 19 to plan, design and construct phase 2 improvements, including bus shelters and median art, along Bridge boulevard between Young avenue and the Riverside drain in the South Valley in Bernalillo county is extended through fiscal year 2027.
SECTION 73. EAGLE RANCH ROAD AND PASEO DEL NORTE INTERSECTION IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 30 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 60 to plan, design, construct and install improvements at the intersection of Eagle Ranch road and paseo del Norte in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 74. GIBSON BOULEVARD SOUTHEAST IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 21 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct and improve Gibson boulevard SE in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 75. MCMAHON BOULEVARD NORTHWEST EXPANSION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 24 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design, construct and expand McMahon boulevard NW from Rockcliff drive to Anasazi Ridge avenue, including the purchase and installation of signal and safety improvements, in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 76. NEAT LANE SOUTHWEST IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 10 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design, construct and improve Neat lane SW in the Atrisco community, including storm drainage, and for other road projects in house district 14 in Bernalillo county is extended through fiscal year 2027.
SECTION 77. PASEO DEL NORTE BOULEVARD NORTHWEST EXPANSION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 25 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design, construct, improve and expand paseo del Norte boulevard NW, including two lanes in each direction, a multi-use trail and bicycle lanes, between Rainbow boulevard and calle Nortena in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 78. QUIET LANE SOUTHWEST IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 11 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design, construct and improve Quiet lane SW in the Atrisco community, including storm drainage, and for other road projects in house district 14 in Bernalillo county is extended through fiscal year 2027.
SECTION 79. SHIPMAN ROAD SOUTHWEST AND CANAL STREET SOUTHWEST IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 13 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design, construct and improve Shipman road SW and Canal street SW in the Atrisco community, including storm drainage, and for other road projects in house district 14 in Bernalillo county is extended through fiscal year 2027.
SECTION 80. SUNSET ROAD DRAINAGE IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 2 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 70 to plan, design and construct drainage improvements to Sunset road SW between Neetsie drive and Gonzales road in the South Valley area of Bernalillo county is extended through fiscal year 2027.
SECTION 81. UNIVERSITY OF NEW MEXICO INDOOR FOOTBALL FIELD RENOVATION--EXPAND PURPOSE--GENERAL FUND.--The university of New Mexico project in Subsection 11 of Section 40 of Chapter 66 of Laws 2024 to plan, design, construct, repair, equip, furnish and renovate the indoor football practice field at the university of New Mexico in Albuquerque in Bernalillo county may include planning, designing, constructing, repairing, equipping, furnishing and renovating the softball practice field at the university of New Mexico.
SECTION 82. UNIVERSITY OF NEW MEXICO MAXWELL MUSEUM RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the university of New Mexico project in Subsection 13 of Section 41 of Chapter 138 of Laws 2021 to plan, design, purchase, equip, renovate and improve the Maxwell museum at the university of New Mexico in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 83. UNIVERSITY OF NEW MEXICO NORTH GOLF COURSE CLUB HOUSE ROOF REPAIR--CHANGE TO NORTH GOLF COURSE CLUB HOUSE IMPROVEMENT--GENERAL FUND.--The unexpended balance of the appropriation to the board of regents of the university of New Mexico in Subsection 19 of Section 40 of Chapter 66 of Laws 2024 to plan, design, construct, repair and replace the roof of the north golf course club house at the university of New Mexico in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct, repair, furnish, equip and improve the north golf course club house at the university of New Mexico in Albuquerque in Bernalillo county.
SECTION 84. UNIVERSITY OF NEW MEXICO ZIMMERMAN LIBRARY SLEEP POD CONSTRUCTION--CHANGE TO UNIVERSITY OF NEW MEXICO SLEEP POD INSTALLATION--GENERAL FUND.--The unexpended balance of the appropriation to the board of regents of the university of New Mexico in Subsection 23 of Section 40 of Chapter 66 of Laws 2024 to plan, design, construct, equip and install sleep pods at Zimmerman library at the university of New Mexico in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct, equip and install sleep pods at the university of New Mexico.
SECTION 85. YOUTH TRANSITIONAL LIVING FACILITY PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 126 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 72 to purchase a facility and to plan, design, construct, renovate, furnish and equip buildings and grounds, fencing and security infrastructure and to purchase and install information technology and related equipment at a youth transitional living facility in Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 86. LA MESA ELEMENTARY SCHOOL INFORMATION TECHNOLOGY IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the public education department project in Subsection 77 of Section 16 of Chapter 199 of Laws 2023 to purchase and install information technology, including related equipment, furniture and infrastructure, digital touch screens and classroom presentation boards, at La Mesa elementary school in the Albuquerque public school district in Bernalillo county is extended through fiscal year 2027.
SECTION 87. MARIE M. HUGHES ELEMENTARY SCHOOL WELLNESS ROOM IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the public education department project in Subsection 87 of Section 16 of Chapter 199 of Laws 2023 to plan, design, build, purchase, equip, furnish and install fixtures, furniture, flooring, carpet, window coverings and related equipment for student wellness rooms at Marie M. Hughes elementary school in the Albuquerque public school district in Bernalillo county is extended through fiscal year 2027.
SECTION 88. PAJARITO ELEMENTARY SCHOOL OUTDOOR CLASSROOM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the public education department project in Subsection 113 of Section 17 of Chapter 138 of Laws 2021 to plan, design, construct, purchase, equip and furnish infrastructure, buildings and landscaping for an outdoor classroom and equipment for community gardens at Pajarito elementary school in the Albuquerque public school district in Bernalillo county is extended through fiscal year 2027.
SECTION 89. VAN BUREN MIDDLE SCHOOL INFORMATION TECHNOLOGY IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the public education department project in Subsection 123 of Section 16 of Chapter 199 of Laws 2023 to purchase and install information technology, including related equipment, furniture and infrastructure, digital touch screens and classroom presentation boards, at Van Buren middle school in the Albuquerque public school district in Bernalillo county is extended through fiscal year 2027.
SECTION 90. FOURTH STREET NW IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 29 of Section 33 of Chapter 138 of Laws 2021 to plan, design and construct road improvements to Fourth street NW from Pueblo Solano road NW to Ortega road NW in Los Ranchos de Albuquerque in Bernalillo county is extended through fiscal year 2027.
SECTION 91. QUEMADO COMMUNITY CENTERS CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 122 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, improve, equip and furnish community centers in Quemado in Catron county is extended through fiscal year 2027.
SECTION 92. CATRON COUNTY AMBULANCE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 164 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip ambulances for Reserve in Catron county is extended through fiscal year 2027.
SECTION 93. HAGERMAN MUNICIPAL SCHOOL DISTRICT ADMINISTRATIVE BUILDING ROOF REPLACEMENT--EXPAND PURPOSE--GENERAL FUND.--The public education department project in Subsection 157 of Section 16 of Chapter 66 of Laws 2024 to plan, design, construct and replace roofs and gutters at the administrative building in the Hagerman municipal school district in Chaves county may include replacing heating, ventilation and air conditioning systems and repairing the roof of the high school administration building in the Hagerman municipal school district.
SECTION 94. ROSWELL SOUTHEAST REGION SCHOOL SHOOTING RANGE IMPROVEMENT--CHANGE TO SHOOTING RANGE EQUIPMENT UPGRADE--CHANGE AGENCY--GENERAL FUND.--The unexpended balance of the appropriation to the public education department in Subsection 156 of Section 16 of Chapter 66 of Laws 2024 to plan, design, construct, upgrade and equip shooting ranges for high schools in communities in the southeast region of Roswell in Chaves county shall not be expended for the original purpose but is appropriated to the local government division to purchase equipment and to plan, design, construct and upgrade facilities, technology and equipment at the Roswell Chaparral skeet club shooting range in Roswell in Chaves county.
SECTION 95. ROSWELL MUSEUM AND ART CENTER IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 133 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, renovate, furnish and equip the Roswell museum and art center, including building system upgrades, in Roswell in Chaves county is extended through fiscal year 2027.
SECTION 96. CIBOLA COUNTY ABOVE-GROUND STORAGE TANKS INSTALLATION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 178 of Section 28 of Chapter 199 of Laws 2023 to plan, design, purchase, equip and install above-ground storage tanks for public service operations in Cibola county is extended through fiscal year 2027.
SECTION 97. COMMUNITY DITCH OF SAN JOSE DE LA CIENEGA IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 3 of Section 28 of Chapter 138 of Laws 2021 to plan, design and construct improvements to the community ditch of San Jose de la Cienega in Cibola county is extended through fiscal year 2027.
SECTION 98. CUBERO ACEQUIA ASSOCIATION ACEQUIA IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 4 of Section 28 of Chapter 138 of Laws 2021 to plan, design and construct improvements for the Cubero acequia association in Cibola county is extended through fiscal year 2027.
SECTION 99. RAMAH CHAPTER CEMETERY CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 9 of Section 25 of Chapter 138 of Laws 2021 to acquire land, to conduct archaeological and environmental studies and to plan, design and construct a community and veterans' cemetery in the Ramah chapter of the Navajo Nation in Cibola county is extended through fiscal year 2027.
SECTION 100. SAN MATEO ACEQUIA ASSOCIATION IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 5 of Section 28 of Chapter 138 of Laws 2021 to plan, design, construct, furnish and equip improvements for the San Mateo acequia association in San Mateo in Cibola county is extended through fiscal year 2027.
SECTION 101. GRANTS DOMESTIC VIOLENCE SHELTER RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 138 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, repair, renovate and equip a domestic violence shelter in Grants in Cibola county is extended through fiscal year 2027.
SECTION 102. RAMAH CHAPTER ROAD GRADER PURCHASE--CHANGE TO DUMP TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 14 of Section 25 of Chapter 199 of Laws 2023 to purchase and equip a road grader for the Ramah chapter of the Navajo Nation in Cibola county shall not be expended for the original purpose but is changed to purchase and equip a dump truck for the Ramah chapter of the Navajo Nation in Cibola county. The time of expenditure is extended through fiscal year 2027.
SECTION 103. COLFAX COUNTY ROAD DEPARTMENT MAINTENANCE TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 183 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip a maintenance truck for the road department in Colfax county is extended through fiscal year 2027.
SECTION 104. EAGLE NEST LAGOON DECOMMISSIONING--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the state parks division of the energy, minerals and natural resources department project in Subsection 4 of Section 19 of Chapter 138 of Laws 2021 to plan, design and construct the decommissioning of sewer lagoons, including dewatering, sludge and lining removal, materials disposal and land restoration, in Eagle Nest in Colfax county is extended through fiscal year 2027.
SECTION 105. EAGLE NEST MOTOR GRADER PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 185 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip a motor grader in Eagle Nest in Colfax county is extended through fiscal year 2027.
SECTION 106. SECOND STREET IMPROVEMENT--CHANGE TO EAGLE NEST STREET IMPROVEMENT--GENERAL FUND.--The unexpended balance of the appropriation to the department of transportation in Subsection 45 of Section 33 of Chapter 199 of Laws 2023 to plan, design, construct and improve Second street in Eagle Nest in Colfax county shall not be expended for the original purpose but is changed to plan, design, construct and improve Second street, Neal avenue and Lake avenue in Eagle Nest in Colfax county.
SECTION 107. EAGLE NEST WATER SYSTEM PHASE 4 CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 14 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct and equip phase 4 of water system improvements, including environmental studies, in Eagle Nest in Colfax county is extended through fiscal year 2027.
SECTION 108. EAGLE NEST WELL HOUSE GENERATOR PURCHASE--CHANGE TO EAGLE NEST WASTEWATER SYSTEM AND WELL HOUSE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of environment in Subsection 15 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct, furnish, equip and install emergency generators for the Eagle Nest well house in Eagle Nest in Colfax county shall not be expended for the original purpose but is changed to plan, design, construct, furnish, equip and install improvements to a well house and wastewater lift stations, including the purchase of generators, pumps, motors and control panels, in Eagle Nest in Colfax county. The time of expenditure is extended through fiscal year 2027.
SECTION 109. COLFAX COUNTY ROAD DEPARTMENT VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 186 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip a tractor trailer for the road department in Colfax county is extended through fiscal year 2027.
SECTION 110. CURRY COUNTY FIRE STATION CONSTRUCTION--CHANGE TO ADULT DETENTION CENTER IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 189 of Section 30 of Chapter 53 of Laws 2022 to plan, design, construct, furnish and equip a fire station for the Countyline volunteer fire department in Curry county shall not be expended for the original purpose but is changed to plan, design and construct improvements to the adult detention center in Clovis in Curry county. The time of expenditure is extended through fiscal year 2027.
SECTION 111. DE BACA COUNTY TRASH TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project in Subsection 22 of Section 19 of Chapter 199 of Laws 2023 to purchase and equip a front loading trash collection truck for the county solid waste facility in De Baca county is extended through fiscal year 2027.
SECTION 112. ALTO DE LAS FLORES MUTUAL DOMESTIC WATER CONSUMERS ASSOCIATION ADMINISTRATION BUILDING CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 154 of Section 29 of Chapter 138 of Laws 2021 to acquire land, to conduct environmental and archaeological studies and to plan, design, construct, purchase, furnish and equip a building, including building relocation, for the Alto de las Flores mutual domestic water consumers association in Dona Ana county is extended through fiscal year 2027.
SECTION 113. BORDER AUTHORITY SANTA TERESA TO SUNLAND PARK ROAD EXTENSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the border authority project originally authorized in Subsection 1 of Section 6 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 88 to plan, design and construct a road between Santa Teresa and Sunland Park in Dona Ana county is extended through fiscal year 2027.
SECTION 114. CARVER ROAD IMPROVEMENT--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The department of transportation project in Subsection 34 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct and improve Carver road in Dona Ana county may include drainage improvements and the acquisition of rights of way. The time of expenditure is extended through fiscal year 2027.
SECTION 115. DONA ANA COUNTY LA MESA COMMUNITY PARK IMPROVEMENT--CHANGE TO LA MESA COMMUNITY CENTER IMPROVEMENT--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 275 of Section 28 of Chapter 66 of Laws 2024 to plan, design, construct, equip, purchase and install improvements at La Mesa community park in Dona Ana county shall not be expended for the original purpose but is changed to plan, design, construct, equip, purchase and install improvements at La Mesa community center in Dona Ana county.
SECTION 116. DONA ANA COUNTY SANTA TERESA ARROYO IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 6 of Section 28 of Chapter 138 of Laws 2021 to acquire permits and rights of way and to plan, design and construct improvements to the Santa Teresa arroyo in Dona Ana county is extended through fiscal year 2027.
SECTION 117. DONA ANA MUTUAL DOMESTIC WATER CONSUMERS ASSOCIATION DRAINAGE IMPROVEMENT--SEVERANCE TAX BONDS--EXTEND TIME.--The time of expenditure for the department of environment project in Subsection 22 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct, repair, improve and protect wastewater infrastructure, including manholes, sewer lines and flood control structures, for the Dona Ana mutual domestic water consumers association in the Picacho Hills area of Dona Ana county is extended through fiscal year 2027.
SECTION 118. TALAVERA MUTUAL DOMESTIC WATER CONSUMERS ASSOCIATION RADIO READ METER PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project in Subsection 32 of Section 19 of Chapter 199 of Laws 2023 to purchase and install radio read meters and related equipment for the Talavera mutual domestic water consumers association in Dona Ana county is extended through fiscal year 2027.
SECTION 119. WESTMORELAND AVENUE ROAD DRAINAGE IMPROVEMENT--CHANGE TO WESTMORELAND AVENUE AREA ROAD DRAINAGE IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the department of transportation in Subsection 50 of Section 33 of Chapter 199 of Laws 2023 to acquire rights of way and to plan, design and construct road, drainage and utility improvements along Westmoreland avenue in Dona Ana county shall not be expended for the original purpose but is changed to acquire rights of way and to plan, design and construct road, drainage and utility improvements in the area of Westmoreland avenue in Dona Ana county. The time of expenditure is extended through fiscal year 2027.
SECTION 120. WESTMORELAND AVENUE ROAD DRAIN AND UTILITY IMPROVEMENT--CHANGE TO WESTMORELAND AVENUE AREA ROAD IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the department of transportation in Subsection 48 of Section 33 of Chapter 66 of Laws 2024 to acquire rights of way for and to plan, design, construct and install road, drainage and utility improvements along Westmoreland avenue in Dona Ana county shall not be expended for the original purpose but is changed to acquire rights of way for and to plan, design, construct and install road, drainage and utility improvements in the area of Westmoreland avenue in Dona Ana county. The time of expenditure is extended through fiscal year 2027.
SECTION 121. ANTHONY MULTIGENERATIONAL BUILDING CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 168 of Section 29 of Chapter 138 of Laws 2021 to acquire land, easements and rights of way and to plan, design, demolish and construct phase 2 of a multigenerational building in Anthony in Dona Ana county is extended through fiscal year 2027.
SECTION 122. CHAMBERINO MUTUAL DOMESTIC WATER CONSUMERS' AND SEWAGE ASSOCIATION ADMINISTRATION FACILITY CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 172 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct an administrative and central operations facility for the Chamberino mutual domestic water consumers' and sewage association in Chamberino in Dona Ana county is extended through fiscal year 2027.
SECTION 123. DONA ANA COUNTY CHAPARRAL FIRE STATION 10 RENOVATION--CHANGE TO CHAPARRAL FIRE STATION 44 RENOVATION--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 218 of Section 28 of Chapter 199 of Laws 2023 to plan, design, construct, renovate, furnish and equip fire station 10 in Chaparral in Dona Ana county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, furnish and equip fire station 44 in Chaparral in Dona Ana county.
SECTION 124. DONA ANA COUNTY DRAINAGE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 35 of Section 33 of Chapter 138 of Laws 2021 to acquire property and to plan, design, construct and equip drainage channels to the Brahman diversion channel in Dona Ana county is extended through fiscal year 2027.
SECTION 125. EAST MADRID AVENUE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 44 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design and construct extensions, including utility and flood control infrastructure, on east Madrid avenue in Las Cruces in Dona Ana county is extended through fiscal year 2027.
SECTION 126. LAS CRUCES EAST MESA AREA ROAD CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 45 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design, construct and improve roads, including utilities and flood control, for the East Mesa area and for other road projects in Las Cruces in Dona Ana county is extended through fiscal year 2027.
SECTION 127. LAS CRUCES INTERNATIONAL AIRPORT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 153 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, renovate, equip, furnish and install improvements for a terminal building, including infrastructure, landscaping and parking, at the Las Cruces international airport in Las Cruces in Dona Ana county is extended through fiscal year 2027.
SECTION 128. LAS CRUCES SEPTIC SYSTEM REPLACEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 25 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct, replace and equip improvements to septic systems in Las Cruces in Dona Ana county is extended through fiscal year 2027.
SECTION 129. NEW MEXICO STATE UNIVERSITY FABIAN GARCIA SCIENCE CENTER EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the New Mexico state university project in Subsection 11 of Section 38 of Chapter 199 of Laws 2023 to purchase equipment for the Fabian Garcia science center at New Mexico state university in Las Cruces in Dona Ana county is extended through fiscal year 2027.
SECTION 130. CALLE DE PICACHO DRAINAGE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 46 of Section 33 of Chapter 138 of Laws 2021 to acquire easements and rights of way and to plan, design, construct and improve drainage along calle de Picacho in Mesilla in Dona Ana county is extended through fiscal year 2027.
SECTION 131. SANTA TERESA PORT OF ENTRY PARKING FACILITY CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the border authority project in Subsection 1 of Section 8 of Chapter 138 of Laws 2021 to plan, design and construct a parking facility on property adjacent to the New Mexico border authority in Santa Teresa in Dona Ana county is extended through fiscal year 2027.
SECTION 132. SUNLAND PARK PUBLIC SAFETY COMPLEX DESIGN--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 187 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct a public safety complex in Sunland Park in Dona Ana county is extended through fiscal year 2027.
SECTION 133. EDDY COUNTY SPLASH PAD CONSTRUCTION--CHANGE TO PLAYGROUND AND PARK EQUIPMENT INSTALLATION--GENERAL FUND.-- The unexpended balance of the appropriation to the local government division in Subsection 310 of Section 28 of Chapter 66 of Laws 2024 to plan, design, construct, install and equip a splash pad for Eddy county shall not be expended for the original purpose but is changed to plan, design, construct and install playground and park equipment in Eddy county.
SECTION 134. WEST HERMOSA DRIVE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 53 of Section 33 of Chapter 138 of Laws 2021 to plan, design and construct improvements to west Hermosa drive between south First street and south Thirteenth street in Artesia in Eddy county is extended through fiscal year 2027.
SECTION 135. CARLSBAD AUTOMATED METER READING SYSTEM PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project in Subsection 42 of Section 19 of Chapter 199 of Laws 2023 to purchase, equip and install an automated water meter reading system in Carlsbad in Eddy county is extended through fiscal year 2027.
SECTION 136. CARLSBAD CANAL STREET STORM DRAIN EXTENSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 79 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 105 to plan, design, construct and extend a storm drain from Canal street to west Fox street along west Greene and south Halagueno streets in Carlsbad in Eddy county is extended through fiscal year 2027.
SECTION 137. CARLSBAD NORTH MESA SENIOR RECREATION CENTER RENOVATION--CHANGE TO CASCADES RECREATION AND WELLNESS CENTER IMPROVEMENT--GENERAL FUND.--The unexpended balance of the appropriation to the aging and long-term services department in Subsection 19 of Section 4 of Chapter 199 of Laws 2023 for renovations to the North Mesa senior recreation center in Carlsbad in Eddy county shall not be expended for the original purpose but is changed to purchase, equip and install recreation, safety and accessibility compliant equipment and furnishings and to plan, design, construct and equip outdoor improvements at the Cascades recreation and wellness center in Carlsbad in Eddy county.
SECTION 138. SOUTHEAST NEW MEXICO COLLEGE HEATING, VENTILATION AND AIR CONDITIONING SYSTEM REPLACEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the higher education department project in Subsection 8 of Section 15 of Chapter 199 of Laws 2023 to replace the heating, ventilation and air conditioning systems campuswide at southeast New Mexico college in Carlsbad in Eddy county is extended through fiscal year 2027.
SECTION 139. BAYARD PUBLIC SAFETY BUILDING IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 195 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct building improvements, including roofing, to the public safety building in Bayard in Grant county is extended through fiscal year 2027.
SECTION 140. BAYARD RECREATION FACILITY IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 196 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, equip and furnish recreational facility and concession stand improvements, including site work and the purchase of equipment, for Bayard in Grant county is extended through fiscal year 2027.
SECTION 141. BAYARD RECREATIONAL FACILITY IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 227 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 302 to plan, design, construct, purchase, equip and furnish recreational facility improvements, including site preparation, in Bayard in Grant county is extended through fiscal year 2027.
SECTION 142. BAYARD SEWER VACUUM TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project in Subsection 265 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip a sewer vacuum truck for Bayard in Grant county is extended through fiscal year 2027.
SECTION 143. BAYARD SLUDGE DEWATERING EQUIPMENT PURCHASE--CHANGE TO WASTEWATER SYSTEM IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the department of environment in Subsection 39 of Section 26 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 303 to plan, design and construct wastewater system improvements, including the purchase of sludge dewatering equipment, in Bayard in Grant county shall not be expended for the original purpose but is changed to plan, design and construct wastewater system improvements in Bayard in Grant county. The time of expenditure is extended through fiscal year 2027.
SECTION 144. HURLEY WATER SYSTEM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 32 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct and equip a water system in Hurley in Grant county is extended through fiscal year 2027.
SECTION 145. ALDO LEOPOLD CHARTER SCHOOL ACTIVITY VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the public education department project in Subsection 144 of Section 16 of Chapter 199 of Laws 2023 to purchase and equip activity vehicles for Aldo Leopold charter school in Silver City in Grant county is extended through fiscal year 2027.
SECTION 146. GUADALUPE COUNTY MAGISTRATE COURT RELOCATION--CHANGE TO GUADALUPE COUNTY MAGISTRATE COURT PROPERTY ACQUISITION, CONSTRUCTION AND RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the administrative office of the courts in Subsection 3 of Section 4 of Chapter 138 of Laws 2021 to plan, design, construct, renovate, furnish and equip a new location for the magistrate court in Guadalupe county shall not be expended for the original purpose but is changed to acquire land and property for and to plan, design, construct, renovate, furnish and equip a magistrate court in Guadalupe county. The time of expenditure is extended through fiscal year 2027.
SECTION 147. GUADALUPE COUNTY MAGISTRATE COURT LAND ACQUISITION--CHANGE TO LAND AND PROPERTY ACQUISITION--GENERAL FUND.--The unexpended balance of the appropriation to the administrative office of the courts in Subsection 2 of Section 3 of Chapter 66 of Laws 2024 to acquire land for the Guadalupe county magistrate court in Guadalupe county shall not be expended for the original purpose but is changed to acquire land and property for and to plan, design, construct, renovate, furnish and equip a magistrate court in Guadalupe county.
SECTION 148. SANTA ROSA MAGISTRATE COURT CONSTRUCTION--CHANGE TO GUADALUPE COUNTY MAGISTRATE COURT COMPLEX ACQUISITION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the administrative office of the courts in Subsection 1 of Section 4 of Chapter 53 of Laws 2022 to plan, design, construct, renovate, furnish and equip a magistrate court in Santa Rosa in Guadalupe county shall not be expended for the original purpose but is changed to acquire land and property for and to plan, design, construct, renovate, furnish and equip a magistrate court complex in Guadalupe county. The time of expenditure is extended through fiscal year 2027.
SECTION 149. SANTA ROSA VACUUM TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project in Subsection 53 of Section 19 of Chapter 199 of Laws 2023 to purchase and equip vacuum trucks for the water department in Santa Rosa in Guadalupe county is extended through fiscal year 2027.
SECTION 150. SANTA ROSA CONSOLIDATED SCHOOL DISTRICT BUS PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the public education department project in Subsection 148 of Section 16 of Chapter 199 of Laws 2023 to purchase and equip an activity bus for the Santa Rosa consolidated school district in Guadalupe county is extended through fiscal year 2027.
SECTION 151. VAUGHN WATER SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 35 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct, purchase, equip and install water system improvements, including water meters, in Vaughn in Guadalupe county is extended through fiscal year 2027.
SECTION 152. HARDING COUNTY ROAD DEPARTMENT HOUSING CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 211 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, furnish and equip employee housing quarters for the road department in Harding county is extended through fiscal year 2027.
SECTION 153. ALBUQUERQUE INTERNATIONAL DISTRICT FAMILY RESOURCE CENTER PURCHASE--CHANGE TO HOBBS FAMILY RESOURCE CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 57 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, purchase, renovate, equip and furnish a family resource center in the international district in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct, purchase, renovate, equip and furnish a family resource center in Hobbs in Lea county. The time of expenditure is extended through fiscal year 2027.
SECTION 154. HOBBS FIBER AND WIRELESS NETWORK INFRASTRUCTURE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 57 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct, furnish and equip a citywide fiber and wireless network, including infrastructure, in Hobbs in Lea county is extended through fiscal year 2027.
SECTION 155. LEA COUNTY COURTHOUSE RENOVATION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 251 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 115 to plan, design, construct, renovate, furnish and equip the historic Lea county courthouse in Lovington in Lea county is extended through fiscal year 2027.
SECTION 156. LEA COUNTY COURTHOUSE RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 223 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, purchase, renovate, equip and furnish the historic county courthouse in Lovington in Lea county is extended through fiscal year 2027.
SECTION 157. LEA COUNTY DETENTION CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 224 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, equip and furnish an addition for the county detention center in Lovington in Lea county is extended through fiscal year 2027.
SECTION 158. LOVINGTON ANIMAL SHELTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 225 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2023, Chapter 203, Section 117 to plan, design, construct, renovate, refurbish and equip an animal services facility and shelter in Lovington in Lea county is extended through fiscal year 2027.
SECTION 159. LOVINGTON BRUSH TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 296 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip a brush truck for Lovington in Lea county is extended through fiscal year 2027.
SECTION 160. LOVINGTON MUNICIPAL FACILITIES INFORMATION TECHNOLOGY PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 297 of Section 28 of Chapter 199 of Laws 2023 to purchase and install information technology and security networks, including related equipment, infrastructure and furniture, for municipal buildings in Lovington in Lea county is extended through fiscal year 2027.
SECTION 161. LOVINGTON MUNICIPAL WATER TOWER DESIGN--CHANGE TO WATER INFRASTRUCTURE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of environment in Subsection 41 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct, purchase and equip a water tower in northwest Lovington in Lea county shall not be expended for the original purpose but is changed to plan, design, construct, equip and install improvements to water infrastructure in Lovington in Lea county. The time of expenditure is extended through fiscal year 2027.
SECTION 162. LINCOLN COUNTY GREENTREE SOLID WASTE AUTHORITY GRAPPLE TRUCK SYSTEM PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project in Subsection 58 of Section 19 of Chapter 199 of Laws 2023 to purchase and equip a grapple truck and green waste collection system for the Greentree solid waste authority in Lincoln county is extended through fiscal year 2027.
SECTION 163. LOS ALAMOS COUNTY AFFORDABLE HOUSING INFRASTRUCTURE CONSTRUCT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 273 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 122 to plan, design and construct affordable housing infrastructure in Los Alamos county is extended through fiscal year 2027.
SECTION 164. UNIVERSITY OF NEW MEXICO-LOS ALAMOS BUILDING 2 ROOF REPAIR--CHANGE TO BUILDING 2 AND BUILDING 3 ROOF REPLACEMENT--GENERAL FUND.--The unexpended balance of the appropriation to the board of regents of the university of New Mexico in Subsection 27 of Section 40 of Chapter 66 of Laws 2024 to plan, design, construct, repair, renovate and replace the roof on building 2 at the Los Alamos branch campus of the university of New Mexico in Los Alamos county shall not be expended for the original purpose but is changed to plan, design, construct, repair, renovate and replace the roofs on building 2 and building 3 at the Los Alamos branch campus of the university of New Mexico in Los Alamos county.
SECTION 165. COLUMBUS PORT OF ENTRY WASTEWATER SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the border authority project in Subsection 2 of Section 8 of Chapter 138 of Laws 2021 to plan, design and construct wastewater system improvements, including a new pond, at the port of entry in Columbus in Luna county is extended through fiscal year 2027.
SECTION 166. BAHAST'LAH CHAPTER WATER LINE EXTENSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 13 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 156 to plan, design, construct, purchase, equip and install water line extensions for the Bahast'lah chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 167. CASAMERO LAKE CHAPTER SENIOR CENTER CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the aging and long-term services department project originally authorized in Subsection 30 of Section 4 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 147 to plan, design, construct, furnish and equip a senior center in the Casamero Lake chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 168. CHICHILTAH CHAPTER FENCE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 15 of Section 25 of Chapter 138 of Laws 2021 to plan, design and construct fencing for the chapter compound in the Chichiltah chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 169. DINE COLLEGE NAVAJO NATION LIVESTOCK RESEARCH CENTER CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 28 of Section 31 of Chapter 277 of Laws 2019 and appropriated to the higher education department in Laws 2023, Chapter 203, Section 138 to plan, design and construct the Navajo Nation livestock, research and extension center on the Crownpoint campus of Dine college in McKinley county is extended through fiscal year 2027.
SECTION 170. IYANBITO CHAPTER HOUSE FENCE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 23 of Section 25 of Chapter 138 of Laws 2021 to make site improvements and to plan, design, construct and equip perimeter fencing for the chapter house in the Iyanbito chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 171. SMITH LAKE CHAPTER HEAVY EQUIPMENT REPAIR SHOP CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 36 of Section 25 of Chapter 138 of Laws 2021 to plan, design and construct a heavy equipment repair shop, including canopies, in the Smith Lake chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 172. THOREAU CHAPTER VETERANS' SERVICE CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 37 of Section 25 of Chapter 138 of Laws 2021 to plan, design, construct, furnish and equip a veterans' service center in the Thoreau chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 173. TO'HAJIILEE CHAPTER WATER LINE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 1 of Section 25 of Chapter 138 of Laws 2021 to plan, design and construct water system improvements, including a water line to connect the Albuquerque system to the To'hajiilee chapter system, for the To'hajiilee chapter of the Navajo Nation in Bernalillo county is extended through fiscal year 2027.
SECTION 174. TSAYATOH CHAPTER SCATTERED POWER LINE RIGHTS OF WAY ACQUISITION AND CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 40 of Section 25 of Chapter 138 of Laws 2021 to acquire easements and rights of way and to plan, design and construct wiring and power lines to homes in the Tsayatoh chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 175. TSAYATOH CHAPTER SCATTERED POWER LINE EXTENSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 13 of Section 48 of Chapter 138 of Laws 2021 to acquire easements and rights of way and to plan, design and construct wiring and power lines to homes in the Tsayatoh chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 176. BACA CHAPTER BATHROOM ADDITION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 13 of Section 25 of Chapter 138 of Laws 2021 to plan, design, construct, furnish and equip residential bathroom additions in the Baca chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 177. BACA CHAPTER BATHROOM ADDITION CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 7 of Section 48 of Chapter 138 of Laws 2021 to plan, design, construct, furnish and equip residential bathroom additions in the Baca chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 178. CASAMERO LAKE CHAPTER SENIOR CENTER IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 24 of Section 31 of Chapter 277 of Laws 2019 and appropriated to the aging and long-term services department in Laws 2020, Chapter 82, Section 49 and reauthorized in Laws 2023, Chapter 203, Section 136 to plan, design, construct, furnish and equip improvements to the senior center in the Casamero Lake chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 179. GALLUP CHILDREN AND FAMILIES FACILITY RENOVATION--EXPAND PURPOSE--GENERAL FUND.--The local government division project in Subsection 370 of Section 28 of Chapter 66 of Laws 2024 to plan, design, construct and renovate transitional housing and facilities for children, youth and families in Gallup in McKinley county may include the purchasing of land and buildings.
SECTION 180. NORTHWEST NEW MEXICO COUNCIL OF GOVERNMENTS BUILDING RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 250 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, repair and renovate the northwest New Mexico council of governments building, including the interior and exterior, in Gallup in McKinley county is extended through fiscal year 2027.
SECTION 181. UNIVERSITY OF NEW MEXICO-GALLUP CAREER TECHNOLOGY AND EDUCATION CENTER RENOVATION--CHANGE TO CAREER TECHNOLOGY AND EDUCATION CENTER AND CONSTRUCTION TECHNOLOGY BUILDING RENOVATION--GENERAL FUND.--The unexpended balance of the appropriation to the board of regents of the university of New Mexico in Subsection 32 of Section 40 of Chapter 199 of Laws 2023 to plan, design, construct and equip renovations to the center for career technology and education at the Gallup branch campus of the university of New Mexico in McKinley county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, furnish and equip a center for career technology and education and a construction technology building at the Gallup branch campus of the university of New Mexico in McKinley county.
SECTION 182. UNIVERSITY OF NEW MEXICO-GALLUP INFRASTRUCTURE REPAIR AND IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the university of New Mexico project in Subsection 22 of Section 41 of Chapter 138 of Laws 2021 to plan, design, construct, improve, repair and equip infrastructure campuswide, including fire suppression and elevator upgrades, at the Gallup campus of the university of New Mexico in McKinley county is extended through fiscal year 2027.
SECTION 183. IYANBITO CHAPTER HOUSE FENCE CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 31 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 142 to plan, design, construct, purchase and install perimeter fencing for the chapter house tract in the Iyanbito chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 184. LAKE VALLEY CHAPTER POWER LINE EXTENSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 83 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 201 to plan, design and construct power lines in the Lake Valley chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 185. MANUELITO CHAPTER HEAVY DUTY TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 41 of Section 25 of Chapter 199 of Laws 2023 to purchase and equip a heavy duty truck for the Manuelito chapter in the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 186. MEXICAN SPRINGS CHAPTER ADMINISTRATION BUILDING IMPROVEMENT--CHANGE TO UTILITY INFRASTRUCTURE CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 43 of Section 25 of Chapter 199 of Laws 2023 to plan, design, construct, equip and improve the intergovernmental administration building in the Mexican Springs chapter of the Navajo Nation in McKinley county shall not be expended for the original purpose but is changed to acquire easements and rights of way and to plan, design, develop and construct utility infrastructure for an intergovernmental administrative building in the Mexican Springs chapter of the Navajo Nation in McKinley county.
SECTION 187. MEXICAN SPRINGS CHAPTER MULTIPURPOSE BUILDING CONSTRUCTION--CHANGE TO ADMINISTRATIVE BUILDING UTILITY INFRASTRUCTURE DEVELOPMENT--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 30 of Section 25 of Chapter 66 of Laws 2024 to plan, design, construct and equip an intergovernmental administrative building in the Mexican Springs chapter of the Navajo Nation in McKinley county shall not be expended for the original purpose but is changed to acquire easements and rights of way and to plan, design and construct utility infrastructure for an administrative building in the Mexican Springs chapter of the Navajo Nation in McKinley county.
SECTION 188. MEXICAN SPRINGS ADMINISTRATIVE BUILDING CONSTRUCTION--CHANGE TO UTILITY INFRASTRUCTURE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 27 of Section 25 of Chapter 138 of Laws 2021 to plan, design, construct and equip an intergovernmental administrative building in the Mexican Springs chapter of the Navajo Nation in McKinley county shall not be expended for the original purpose but is changed to acquire easements and rights of way and to plan, design and construct utility infrastructure for an administrative building in the Mexican Springs chapter of the Navajo Nation in McKinley county. The time of expenditure is extended through fiscal year in 2027.
SECTION 189. PREWITT SEEWALD ESTATES POWER LINE EXTENSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 38 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 148 to plan, design and construct a power line extension to the Seewald estates area in Prewitt in the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 190. PUEBLO PINTADO CHAPTER BUZZARD CANYON POWER LINE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 32 of Section 25 of Chapter 138 of Laws 2021 to acquire easements and rights of way and to plan, design and construct power line extensions for the Pueblo Pintado chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 191. MCKINLEY COUNTY RAMAH SENIOR CENTER VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the aging and long-term services department project in Subsection 29 of Section 4 of Chapter 199 of Laws 2023 to purchase and equip vehicles for the Ramah senior center in McKinley county is extended through fiscal year 2027.
SECTION 192. ROCK SPRINGS CHAPTER MULTIPURPOSE BUILDING CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 35 of Section 25 of Chapter 138 of Laws 2021 to acquire land for and to plan, design, construct, furnish and equip a multipurpose building in the Rock Springs chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 193. UNITED STATES HIGHWAY 491 AND CHEE DODGE ELEMENTARY SCHOOL ACCESS ROAD IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 104 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 150 to plan, design and construct improvements, including a turnout, to the access road from United States highway 491 to Chee Dodge elementary school in the Rock Springs chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 194. SHIPROCK CHAPTER SENIOR CENTER PARKING LOT IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 40 of Section 5 of Chapter 138 of Laws 2021 to plan, design, construct, repair, equip and install improvements to the Shiprock senior center parking lot in the Shiprock chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 195. SMITH LAKE CHAPTER COMMUNITY POWER LINE EXTENSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 3 of Section 48 of Chapter 138 of Laws 2021 to acquire easements and rights of way and to plan, design and construct a power line extension in the Smith Lake chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 196. SMITH LAKE CHAPTER VETERANS CENTER IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 44 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 153 to plan, design, construct, renovate and improve the Smith Lake veterans center for the Smith Lake chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 197. THOREAU SENIOR CENTER VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the aging and long-term services department project in Subsection 31 of Section 4 of Chapter 199 of Laws 2023 to purchase and equip vehicles for the Thoreau senior center in McKinley county is extended through fiscal year 2027.
SECTION 198. COUNTY ROAD 51 IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 66 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct and improve county road 51 in the Thoreau chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 199. TOHATCHI CHAPTER LEACH FIELD REPLACEMENT--CHANGE TO CONSTRUCT A WAREHOUSE--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 38 of Section 25 of Chapter 138 of Laws 2021 to acquire rights of way and easements and to plan, design and construct a leach field replacement in the Tohatchi chapter of the Navajo Nation in McKinley county shall not be expended for the original purpose but is changed to plan, design and construct a warehouse for the Tohatchi chapter of the Navajo Nation in McKinley county. The time of expenditure is extended through fiscal year 2027.
SECTION 200. TOHATCHI CHAPTER NAKAI COMMUNITY PARK RENOVATION--CHANGE TO WAREHOUSE CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 38 of Section 25 of Chapter 66 of Laws 2024 to plan, design, construct, renovate, furnish and equip Nakai park in the Tohatchi chapter of the Navajo Nation in McKinley county shall not be expended for the original purpose but is changed to plan, design and construct a warehouse for the Tohatchi chapter of the Navajo Nation in McKinley county.
SECTION 201. TOHATCHI CHAPTER PUBLIC SAFETY COMPLEX CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 39 of Section 25 of Chapter 138 of Laws 2021 to acquire easements and rights of way and to plan, design, construct and equip a public safety complex, including hazardous materials abatement and demolition, in the Tohatchi chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 202. TOHATCHI CHAPTER LEACH FIELD CONSTRUCTION--CHANGE TO PUBLIC SAFETY COMPLEX CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 19 of Section 26 of Chapter 53 of Laws 2022 to plan, design, construct, improve, replace, install and equip septic tanks and leach fields for the Tohatchi chapter of the Navajo Nation in McKinley county shall not be expended for the original purpose but is changed to plan, design, construct, furnish and equip a public safety complex in the Tohatchi chapter of the Navajo Nation in McKinley county. The time of expenditure is extended through fiscal year 2027.
SECTION 203. TSAYATOH CHAPTER SCATTERED POWER LINE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 41 of Section 25 of Chapter 138 of Laws 2021 to acquire easements and rights of way and to plan, design, construct and improve the electrical infrastructure, including house wiring and power line extension, in the Tsayatoh chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 204. TWIN LAKES CHAPTER HOUSE DEMOLITION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 43 of Section 25 of Chapter 138 of Laws 2021 to plan, demolish and remove a former chapter house in the Twin Lakes chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 205. WHITEHORSE LAKE CHAPTER BATHROOM ADDITION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 45 of Section 25 of Chapter 138 of Laws 2021 to plan, design, construct and equip bathroom additions in the Whitehorse Lake chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 206. WHITEHORSE LAKE CHAPTER BATHROOM ADDITION CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 16 of Section 48 of Chapter 138 of Laws 2021 to plan, design, construct and equip bathroom additions in the Whitehorse Lake chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 207. ZUNI PUEBLO WASTEWATER INFRASTRUCTURE CONSTRUCTION--CHANGE TO FIRE AND EMERGENCY MEDICAL SERVICES FACILITY--EXTEND TIME--GENERAL FUND.--The unexpended balance of the Indian affairs department project originally authorized in Subsection 54 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 158 to plan, design and construct wastewater infrastructure for a commercial development area at the Pueblo of Zuni in McKinley county shall not be expended for the original or reauthorized purpose but is changed to plan, design, construct, furnish and equip a fire and emergency medical services facility for the Pueblo of Zuni in McKinley county. The time of expenditure is extended through fiscal year 2027.
SECTION 208. ACEQUIA DE LA ISLA DAM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 8 of Section 28 of Chapter 138 of Laws 2021 to plan, design, construct and install improvements to the Morphy lake dam and the acequia de la Isla, including the acquisition of high-hazard dam monitoring equipment, for the acequia de la Isla in Mora county is extended through fiscal year 2027.
SECTION 209. AGUA PURA MUTUAL DOMESTIC WATER CONSUMERS AND MUTUAL SEWAGE WORKS ASSOCIATION WATER SYSTEM IMPROVEMENT--CHANGE TO FILTRATION SYSTEM AND WELL CONSTRUCTION AND WATER LINE REPLACEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of environment in Subsection 46 of Section 21 of Chapter 138 of Laws 2021 to plan, design and construct infrastructure improvements, including water supply lines and well construction, for the Agua Pura mutual domestic water consumers association in Mora county shall not be expended for the original purpose but is changed to plan, design, construct and replace a well, a filtration and chlorination system and water lines for the Agua Pura mutual domestic water consumers and mutual sewage works association in Mora county. The time of expenditure is extended through fiscal year 2027.
SECTION 210. CRYSTAL CHAPTER GREEN KNOLL SPLIT MESA WATER SYSTEM CONSTRUCTION--CHANGE TO CRYSTAL CHAPTER CISTERN AND SEPTIC SYSTEM CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 10 of Section 48 of Chapter 138 of Laws 2021 to plan, design and construct a water system, including water lines and water storage, for the Green Knoll and Split Mesa areas in the Crystal chapter of the Navajo Nation in McKinley county shall not be expended for the original purpose but is changed to plan, design and construct cistern and septic systems in the Crystal chapter of the Navajo Nation in McKinley and San Juan counties. The time of expenditure is extended through fiscal year 2027.
SECTION 211. NORTH CENTRAL REGIONAL TRANSIT DISTRICT BUS PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 332 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip transit buses for the north central regional transit district in Rio Arriba, Santa Fe, Los Alamos and Taos counties is extended through fiscal year 2027.
SECTION 212. NAVAJO NATION CODE TALKERS MUSEUM CONSTRUCTION AND DESIGN--CHANGE TO ACQUISITION AND CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 1 of Section 25 of Chapter 66 of Laws 2024 to plan, design, construct, furnish and equip a Navajo code talkers museum in the Tse Bonito area of the Navajo Nation in McKinley county shall not be expended for the original purpose but is changed to acquire property and to plan, design, construct, furnish and equip a Navajo code talkers museum for the Navajo Nation.
SECTION 213. TSE BONITO NAVAJO CODE TALKERS MUSEUM CONSTRUCTION--CHANGE TO PROPERTY ACQUISITION AND CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 18 of Section 25 of Chapter 199 of Laws 2023 to plan, design, construct, furnish and equip a Navajo code talkers museum in the Tse Bonito area of the Navajo Nation in McKinley county shall not be expended for the original purpose but is changed to acquire property and to plan, design, construct, furnish and equip a Navajo code talkers museum for the Navajo Nation. The time of expenditure is extended through fiscal year 2027.
SECTION 214. NAVAJO NATION CODE TALKERS MUSEUM AND VETERANS' CENTER CONSTRUCTION--CHANGE TO PROPERTY ACQUISITION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department originally authorized in Subsection 16 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 132 to plan, design, construct, furnish and equip a Navajo code talkers museum in the Tse Bonito area shall not be expended for the original or reauthorized purpose but is changed to acquire property and to plan, design, construct, furnish and equip a Navajo code talkers museum for the Navajo Nation. The time of expenditure is extended through fiscal year 2027.
SECTION 215. NORTH CENTRAL REGIONAL TRANSIT DISTRICT ELECTRIC BUS PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 304 of Section 30 of Chapter 53 of Laws 2022 to purchase, replace and equip electric buses for the north central regional transit district for public transit service in Rio Arriba, Los Alamos, Santa Fe and Taos counties is extended through fiscal year 2027.
SECTION 216. SANTA FE-POJOAQUE SOIL AND WATER CONSERVATION DISTRICT SANTA CRUZ FLOOD CONTROL DAM BARRIER CONSTRUCTION--CHANGE TO SANTA CRUZ HIGH-HAZARD DAM SITE EROSION CONTROL--GENERAL FUND.--The unexpended balance of the appropriation to the board of regents of New Mexico state university in Subsection 23 of Section 38 of Chapter 199 of Laws 2023 to purchase, construct and install dam barriers at Santa Cruz high-hazard flood control dams in the Santa Fe-Pojoaque soil and water conservation district in Rio Arriba and Santa Fe counties shall not be expended for the original purpose but is changed to purchase, construct and install erosion control site improvements at Santa Cruz high-hazard flood control dams in the Santa Fe-Pojoaque soil and water conservation district.
SECTION 217. UNIVERSITY OF NEW MEXICO HEALTH CARE SIMULATIONS LABORATORY IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the university of New Mexico project in Subsection 23 of Section 41 of Chapter 138 of Laws 2021 to plan, design, construct, renovate, improve, purchase and install information technology and equipment for simulations laboratories at the university of New Mexico in Albuquerque in Bernalillo county and in Rio Rancho in Sandoval county is extended through fiscal year 2027.
SECTION 218. TIMBERON WATER AND SANITATION DISTRICT RESERVOIR CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project originally authorized in Subsection 66 of Section 26 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 162 to plan, design and construct a water storage containment reservoir, including fittings, valves, gauges, fencing and access road, for the Timberon water and sanitation district in Otero county is extended through fiscal year 2027.
SECTION 219. TULAROSA COMMUNITY DITCH PIPELINE IMPROVEMENT--CHANGE TO ACEQUIA AND RESERVOIR IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the interstate stream commission in Subsection 10 of Section 28 of Chapter 138 of Laws 2021 to plan, design, construct and upgrade a pipeline and water conveyance system for the Tularosa community ditch association in Otero county shall not be expended for the original purpose but is changed to plan, design, construct and improve the acequia system and reservoir, including pipelines, gates and reservoir restoration, for the Tularosa community ditch in Otero county. The time of expenditure is extended through fiscal year 2027.
SECTION 220. TULAROSA COMMUNITY DITCH GATES IMPROVEMENT--CHANGE TO GATES AND RESERVOIR IMPROVEMENT--EXTEND TIME-- SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the interstate stream commission in Subsection 9 of Section 28 of Chapter 138 of Laws 2021 to plan, design, construct and improve the acequia system, including replacement of switch gates, for the Tularosa community ditch in Otero county shall not be expended for the original purpose but is changed to plan, design, construct and improve the acequia system and reservoir, including pipelines, gates and reservoir restoration, for the Tularosa community ditch in Otero county. The time of expenditure is extended through fiscal year 2027.
SECTION 221. ALAMOGORDO FIRE DEPARTMENT ADMINISTRATIVE OFFICE AND EMERGENCY OPERATIONS CENTER RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 259 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2023, Chapter 203, Section 164 to plan, design, renovate, purchase, furnish and equip a facility to house fire department administrative offices and an emergency operations center, including a gymnasium, in Alamogordo in Otero county is extended through fiscal year 2027.
SECTION 222. ALAMOGORDO POLICE DEPARTMENT STAIRLIFT INSTALLATION--EXPAND PURPOSE--EXTEND TIME--GENERAL FUND.--The local government division project in Subsection 339 of Section 28 of Chapter 199 of Laws 2023 to purchase and install an accessibility-compliant stairlift elevator at the police department facility in Alamogordo in Otero county may include the purchase and equipping of vehicles for the police department. The time of expenditure is extended through fiscal year 2027.
SECTION 223. OTERO COUNTY ROOF REPLACEMENT--EXPAND PURPOSE--GENERAL FUND.--The local government division project in Subsection 392 of Section 28 of Chapter 66 of Laws 2024 to plan, design, construct and replace the roof on the old ACES school building, including gutters and soffits, in Alamogordo in Otero county may include exterior insulation finishing systems and other improvements to that building.
SECTION 224. CLOUDCROFT WATER AND WASTEWATER SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project originally authorized in Subsection 56 of Section 26 of Chapter 81 of Laws 2020 and reauthorized in Laws 2022, Chapter 52, Section 83 and again reauthorized in Laws 2023, Chapter 203, Section 167 to plan, design and construct improvements to contaminated water systems, including the PURe water project and improvements to the wastewater treatment plant, in Cloudcroft in Otero county is extended through fiscal year 2027.
SECTION 225. CLOUDCROFT WASTEWATER TREATMENT PLANT ACQUISITION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 50 of Section 21 of Chapter 138 of Laws 2021 to purchase property for a wastewater treatment plant for Cloudcroft in Otero county is extended through fiscal year 2027.
SECTION 226. CLOUDCROFT WASTEWATER TREATMENT FACILITY IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project originally authorized in Subsection 69 of Section 26 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 168 to plan, design, construct, purchase, equip and install improvements, including an emergency generator and fan press, to a wastewater treatment facility in Cloudcroft in Otero county is extended through fiscal year 2027.
SECTION 227. CLOUDCROFT WASTEWATER TREATMENT FACILITY AND GENERATOR IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project originally authorized in Subsection 68 of Section 26 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 169 to plan, design, construct, purchase, equip and install improvements, including an emergency generator and fan press, to a wastewater treatment facility in Cloudcroft in Otero county is extended through fiscal year 2027.
SECTION 228. TULAROSA WASTEWATER SYSTEM IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project originally authorized in Subsection 71 of Section 26 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 170 to plan, design, purchase, equip and construct improvements to the wastewater treatment plant and system, including rehabilitation of an aeration basin and purchase of a monitoring system, in Tularosa in Otero county is extended through fiscal year 2027.
SECTION 229. QUAY COUNTY EMERGENCY MEDICAL SERVICES RADIO EQUIPMENT IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 343 of Section 28 of Chapter 199 of Laws 2023 to purchase, equip and replace fire and emergency medical services radio equipment and information technology for the dispatch center and emergency departments in Quay county is extended through fiscal year 2027.
SECTION 230. TUCUMCARI PRINCESS THEATER RENOVATION--CHANGE TO HISTORIC BUILDING RENOVATION--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 399 of Section 28 of Chapter 66 of Laws 2024 to renovate, reconstruct and repair the historical Princess theater in Tucumcari in Quay county shall not be expended for the original purpose but is changed to plan, design, construct, repair, renovate and equip the historic Princess theater in Tucumcari in Quay county.
SECTION 231. TUCUMCARI SANITATION TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 349 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip a sanitation truck for Tucumcari in Quay county is extended through fiscal year 2027.
SECTION 232. ACEQUIA DE LA OTRA VANDA IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the interstate stream commission project originally authorized in Subsection 29 of Section 33 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 173 to plan, design and construct improvements to the acequia de la Otro Vanda in Rio Arriba county is extended through fiscal year 2027.
SECTION 233. ACEQUIA MESA DEL MEDIO IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the interstate stream commission project originally authorized in Subsection 20 of Section 33 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 175 to plan, design and construct improvements for the acequia Mesa del Medio in Rio Arriba county is extended through fiscal year 2027.
SECTION 234. CHAMA WASTEWATER SYSTEM AND SEWER LINE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project originally authorized in Subsection 71 of Section 26 of Chapter 81 of Laws 2020 and reauthorized in Laws 2023, Chapter 203, Section 179 to plan, design and construct a wastewater system and sewer line improvements for Chama in Rio Arriba county is extended through fiscal year 2027.
SECTION 235. JICARILLA APACHE NATION ACCESSIBLE VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 77 of Section 25 of Chapter 199 of Laws 2023 to purchase an accessible vehicle and equipment for a community health and fitness center in the Jicarilla Apache Nation in Rio Arriba county is extended through fiscal year 2027.
SECTION 236. JICARILLA APACHE NATION EMERGENCY MEDICAL EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 75 of Section 25 of Chapter 199 of Laws 2023 to purchase and equip chest compression systems for ambulances and emergency medical services in the Jicarilla Apache Nation in Rio Arriba county is extended through fiscal year 2027.
SECTION 237. JICARILLA APACHE NATION SUPERMARKET EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 78 of Section 25 of Chapter 199 of Laws 2023 to purchase and equip a baler, compactor and other equipment for the Jicarilla supermarket in the Jicarilla Apache Nation in Rio Arriba county is extended through fiscal year 2027.
SECTION 238. JICARILLA APACHE NATION UTILITY LINES CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 16 of Section 47 of Chapter 53 of Laws 2022 to plan, design, construct and equip utility lines for the Jicarilla Apache Nation in Rio Arriba county is extended through fiscal year 2027.
SECTION 239. JICARILLA APACHE NATION WORKFORCE INNOVATION AND OPPORTUNITY ACT STUDENT VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 81 of Section 25 of Chapter 199 of Laws 2023 to purchase and equip vehicles and equipment for workforce innovation opportunity students in the Jicarilla Apache Nation in Rio Arriba county is extended through fiscal year 2027.
SECTION 240. NORTHERN NEW MEXICO STATE SCHOOL HEATING, VENTILATION AND AIR CONDITIONING SYSTEM AND CONTROL IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the northern New Mexico state school project in Subsection 1 of Section 40 of Chapter 138 of Laws 2021 to plan, design, construct, equip and install infrastructure improvements to heating, ventilation and air conditioning systems and controls at northern New Mexico state school in Rio Arriba county is extended through fiscal year 2027.
SECTION 241. PIEDRA LUMBRE VISITORS CENTER RENOVATE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of finance and administration project originally authorized in Subsection 2 of Section 28 of Chapter 277 of Laws 2019 and reauthorized in Laws 2020, Chapter 82, Section 66 and again reauthorized in Laws 2023, Chapter 203, Section 183 to plan, design, renovate, repair, construct, furnish, equip, abate and remove asbestos, lead-based paint and other hazardous materials and to demolish and dispose of existing structures at the Piedra Lumbre visitors center for the San Joaquin del Rio de Chama, Juan Bautista Baldez and Tierra Amarilla land grants-mercedes in Rio Arriba county is extended through fiscal year 2027.
SECTION 242. RIO ARRIBA COUNTY EMBUDO FIBER OPTIC EXPANSION--CHANGE TO RIO ARRIBA COUNTY FACILITIES FIBER OPTIC INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 278 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct REDINet repeater fiber optic expansions, including 911 security improvements, for governmental business operations in Embudo in Rio Arriba county shall not be expended for the original purpose but is changed to plan, design, construct and equip fiber optic installations for county facilities in Rio Arriba county. The time of expenditure is extended through fiscal year 2027.
SECTION 243. RIO ARRIBA COUNTY EMPOWERMENT CENTER REDINET COMMUNICATION INFRASTRUCTURE INSTALLATION--CHANGE TO RIO ARRIBA COUNTY FACILITIES FIBER OPTIC INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 393 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct and install communications equipment and infrastructure, including four-strand fiber terminations on existing lateral service off of the REDINet backbone, at the Rio Arriba empowerment center in Espanola in Rio Arriba county shall not be expended for the original purpose but is changed to plan, design, construct and equip fiber optic installations for county facilities in Rio Arriba county. The time of expenditure is extended through fiscal year 2027.
SECTION 244. RIO ARRIBA COUNTY VELARDE RESIDENTIAL RECOVERY CENTER REDINET CONSTRUCTION--CHANGE TO RIO ARRIBA COUNTY FACILITIES FIBER OPTIC INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 394 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct a micro fiber installation for five sites on the campus of a residential recovery facility in Velarde in Rio Arriba county shall not be expended for the original purpose but is changed to plan, design, construct and equip fiber optic installations for county facilities in Rio Arriba county. The time of expenditure is extended through fiscal year 2027.
SECTION 245. RIO ARRIBA COUNTY HOUSING AND RESIDENTIAL CARE FACILITIES LAND ACQUISITION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 270 of Section 29 of Chapter 138 of Laws 2021 to acquire land for and to plan, design, develop and construct workforce housing and residential care facilities in Rio Arriba county is extended through fiscal year 2027.
SECTION 246. RIO ARRIBA COUNTY OJO CALIENTE COMMUNITY CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 273 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct a community center in the vicinity of Ojo Caliente in Rio Arriba county is extended through fiscal year 2027.
SECTION 247. TIERRA AMARILLA LAND GRANT LAND AND WATER RIGHTS ACQUISITION--CHANGE TO LAND ACQUISITION AND LOAN REPAYMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division originally authorized in Subsection 276 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2023, Chapter 203, Section 178 to acquire vacant land and water rights within the exterior boundaries of the land grant-merced de los Pueblos de Tierra Amarilla in Rio Arriba county shall not be expended for the original or reauthorized purpose but is changed to acquire land, including the repayment of a loan for the purpose of purchasing property, for the land grant-merced de los Pueblos de Tierra Amarilla. The time of expenditure is extended through fiscal year 2027.
SECTION 248. TRUCHAS MUTUAL DOMESTIC WATER CONSUMERS' ASSOCIATION AND MUTUAL SEWAGE WORKS ASSOCIATION AUTOMATED METER READING SYSTEM PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project in Subsection 82 of Section 19 of Chapter 199 of Laws 2023 to purchase, equip and install automated meter reading systems, including information technology and infrastructure and replacement of meters, for the Truchas mutual domestic water consumers' association and mutual sewage works association in Rio Arriba county is extended through fiscal year 2027.
SECTION 249. TRUCHAS MUTUAL DOMESTIC WATER CONSUMERS' ASSOCIATION AND MUTUAL SEWAGE WORKS ASSOCIATION WATER METER PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 55 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct, purchase and install smart water meters and related information technology for the Truchas mutual domestic water consumers' association and mutual sewage works association in Rio Arriba county is extended through fiscal year 2027.
SECTION 250. ACEQUIA DEL RINCON RIO ARRIBA IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 15 of Section 28 of Chapter 138 of Laws 2021 to plan, design and construct improvements to the acequia del Rincon in Rio Arriba county is extended through fiscal year 2027.
SECTION 251. ALCALDE LA LOMA VISTA CEMETERY RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 277 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, equip and renovate a cemetery in Alcalde in Rio Arriba county is extended through fiscal year 2027.
SECTION 252. CHAMA WATER METER PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project in Subsection 84 of Section 19 of Chapter 199 of Laws 2023 to purchase, equip and install water meters and implementation systems in Chama in Rio Arriba county is extended through fiscal year 2027.
SECTION 253. CHAMA WASTEWATER SYSTEM AND SEWER LINE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 57 of Section 21 of Chapter 138 of Laws 2021 to plan, design and construct wastewater system improvements, including sewer line extensions, for Chama in Rio Arriba county is extended through fiscal year 2027.
SECTION 254. ESPANOLA LA JOYA FIRE STATION CONSTRUCTION--CHANGE TO FIRE STATION AND REGIONAL TRAINING FACILITY ACQUISITION--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 329 of Section 30 of Chapter 53 of Laws 2022 to plan, design, construct and replace a fire station to meet international organization for standardization ratings for Espanola in Rio Arriba and Santa Fe counties shall not be expended for the original purpose but is changed to acquire property and to plan, design, construct, equip and make infrastructure improvements to a fire station and regional training facility in Espanola in Rio Arriba county.
SECTION 255. ESPANOLA MISION Y CONVENTO VISITOR CENTER ROOF REPLACEMENT--CHANGE TO MUNICIPAL BUILDING IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 330 of Section 30 of Chapter 53 of Laws 2022 to replace and install roofing at the Mision y Convento visitor center in Espanola in Rio Arriba county shall not be expended for the original purpose but is changed to plan, design, construct and make improvements to municipal buildings in Espanola. The time of expenditure is extended through fiscal year 2027.
SECTION 256. ESPANOLA SENIOR CENTER RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 33 of Section 5 of Chapter 138 of Laws 2021 to plan, design, construct and improve the interior and exterior of the Espanola senior center, including the purchase and installation of equipment, in Espanola in Rio Arriba county is extended through fiscal year 2027.
SECTION 257. ESPANOLA VALDEZ PARK EXPANSION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 280 of Section 29 of Chapter 138 of Laws 2021 to acquire property for and to plan, design, construct, equip, renovate and expand Valdez park, including replacement of existing playground equipment, in Espanola in Rio Arriba county is extended through fiscal year 2027.
SECTION 258. ESPANOLA VALDEZ PARK SKATEBOARD PARK CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 281 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct basketball courts and a skate park at Valdez park in Espanola in Rio Arriba county is extended through fiscal year 2027.
SECTION 259. RIO ARRIBA COUNTY COMMUNITY SERVICES CENTER RENOVATION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 326 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 181 to plan, design, equip, renovate and repair a facility to serve as a community services delivery center and business development hub in Espanola in Rio Arriba county is extended through fiscal year 2027.
SECTION 260. RIO ARRIBA COUNTY EMPOWERMENT CENTER RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 282 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, equip and renovate the Rio Arriba empowerment center in Espanola in Rio Arriba county is extended through fiscal year 2027.
SECTION 261. RIO ARRIBA COUNTY LOW RIDER MUSEUM CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 328 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 182 to plan, design, prepare the site, construct, renovate and equip a low rider museum in Espanola in Rio Arriba county is extended through fiscal year 2027.
SECTION 262. SILKEY WAY EXPANSION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 75 of Section 33 of Chapter 138 of Laws 2021 to acquire property for and to plan, design, construct and expand Silkey way in Espanola in Rio Arriba county is extended through fiscal year 2027.
SECTION 263. ACEQUIA DE OJO SARCO PHASE 5 DITCH LINING CONSTRUCTION--EXPAND PURPOSE--GENERAL FUND.--The interstate stream commission project in Subsection 16 of Section 27 of Chapter 66 of Laws 2024 to plan, design and construct phase 5 improvements, including the installation of ditch linings, for the acequia de Ojo Sarco in Rio Arriba county may include the purchase of new track for a trackhoe and repair and upgrading of heavy equipment.
SECTION 264. ELIDA WASTEWATER SYSTEM CONSTRUCTION--CHANGE TO WATER SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of environment originally authorized in Subsection 77 of Section 26 of Chapter 81 of Laws 2020 and reauthorized in Laws 2024, Chapter 65, Section 165 to to plan, design, construct, furnish and equip a wastewater system in Elida in Roosevelt county shall not be expended for the original or reauthorized purpose but is changed to plan, design, construct and equip water system improvements, including the replacement of water lines from a well site to water storage tanks, the rehabilitation of wells and the purchase of supervisory control and data acquisition components, in Elida in Roosevelt county. The time of expenditure is extended through fiscal year 2027.
SECTION 265. ELIDA MUNICIPAL SCHOOL DISTRICT SCHOOL BUS PURCHASE--CHANGE TO ACTIVITY VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the public education department in Subsection 172 of Section 16 of Chapter 199 of Laws 2023 to purchase and equip an activity bus, including addition of the school logo and colors, for the Elida municipal school district in Roosevelt county shall not be expended for the original purpose but is changed to purchase and equip activity vehicles for the Elida municipal school district. The time of expenditure is extended through fiscal year 2027.
SECTION 266. PORTALES CHIP SPREADER PURCHASE--CHANGE TO GARBAGE TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 362 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip a chip spreader for the street works department in Portales in Roosevelt county shall not be expended for the original purpose but is changed to purchase and equip a garbage truck for the solid waste department in Portales. The time of expenditure is extended through fiscal year 2027.
SECTION 267. PORTALES EMULSION TANK PURCHASE--CHANGE TO GARBAGE TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 363 of Section 28 of Chapter 199 of Laws 2023 to purchase, install and equip emulsion tanks for the street works department in Portales in Roosevelt county shall not be expended for the original purpose but is changed to purchase and equip a garbage truck for the solid waste department in Portales. The time of expenditure is extended through fiscal year 2027.
SECTION 268. BLOOMFIELD IRRIGATION DISTRICT FLUME IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the office of the state engineer project originally authorized in Subsection 5 of Section 23 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 185 to plan, design and construct improvements to the district irrigation ditch, including the Blanco flume, for the Bloomfield irrigation district in San Juan county is extended through fiscal year 2027.
SECTION 269. GADII'AHI/TO'KOI CHAPTER ADMINISTRATIVE COMPLEX CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 62 of Section 25 of Chapter 138 of Laws 2021 to plan, design, construct, equip and furnish an administrative complex for the Gadii'ahi/To'koi chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 270. GADII'AHI/TO'KOI CHAPTER SENIOR CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 39 of Section 5 of Chapter 138 of Laws 2021 to plan, design, construct, equip and furnish a senior center, including infrastructure, for the Gadii'ahi/To'koi chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 271. HILLSIDE IRRIGATION DITCH ACEQUIA HEADGATE SPILLWAY SYSTEM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 16 of Section 28 of Chapter 138 of Laws 2021 to plan, design and construct a headgate spillway system for the Hillside irrigation ditch in San Juan county is extended through fiscal year 2027.
SECTION 272. LAKE VALLEY CHAPTER ROAD GRADER PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 95 of Section 25 of Chapter 199 of Laws 2023 to purchase and equip heavy equipment, including a road grader, for the Lake Valley chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 273. NAVAJO ROUTE 571 GADII'AHI/TO'KOI CHAPTER IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project in Subsection 2 of Section 48 of Chapter 53 of Laws 2023 to plan, design and construct road improvements to Navajo route 571 in the Gadii'ahi/To'koi chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 274. NAVAJO DAM DOMESTIC WATER CONSUMERS AND MUTUAL SEWAGE WORKS COOPERATIVE WATER STORAGE TANK CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 62 of Section 21 of Chapter 138 of Laws 2021 to purchase land for and to plan, design, construct, purchase and install water storage tanks and related equipment, including concrete slabs and fencing, for the Navajo Dam domestic water consumers and mutual sewage works cooperative in San Juan county is extended through fiscal year 2027.
SECTION 275. NEW MEXICO HIGHWAY 371 AND NAVAJO ROUTE 36 TRAFFIC SIGNAL CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 116 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 187 to plan, design, construct, purchase and install a traffic signal and related road work, including widening, at the intersection of New Mexico highway 371 and Navajo route 36 in San Juan county is extended through fiscal year 2027.
SECTION 276. NAVAJO NATION SCATTERED POWER LINE CONSTRUCTION--CHANGE TO RED VALLEY CHAPTER MITTEN ROCK TRANSFER STATION CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 99 of Section 25 of Chapter 199 of Laws 2023 to plan, design and construct scattered power lines in the Mitten Rock area of the Red Valley chapter of the Navajo Nation in San Juan county shall not be expended for the original purpose but is changed to plan, design, construct and equip the Mitten Rock transfer station in the Red Valley chapter of the Navajo Nation in San Juan county.
SECTION 277. TSE ALNAOZTI'I' CHAPTER WATER LINE AND BATHROOM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 67 of Section 25 of Chapter 138 of Laws 2021 to acquire rights of way and easements and to plan, design and construct water line extensions and bathroom additions in the Tse Alnaozti'i' chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 278. TSE'DAA'KAAN CHAPTER SERVICE CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 73 of Section 25 of Chapter 138 of Laws 2021 to plan, design and construct a community service center in the Tse'Daa'Kaan chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 279. AZTEC WATER SYSTEM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 61 of Section 21 of Chapter 138 of Laws 2021 to acquire easements and to plan, design and construct a water system and a transmission line for Aztec in San Juan county is extended through fiscal year 2027.
SECTION 280. BECLABITO CHAPTER HELIPAD ACCESS ROAD CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 82 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct and improve a helipad access road for the Beclabito chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 281. BECLABITO CHAPTER TRANSFER STATION CONSTRUCTION--CHANGE TO HELIPAD CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 89 of Section 25 of Chapter 199 of Laws 2023 to acquire easements and rights of way and to plan, design, construct and equip a solid waste transfer station in the Beclabito chapter of the Navajo Nation in San Juan county shall not be expended for the original purpose but is changed to plan, design and construct a helipad in the Beclabito chapter of the Navajo Nation in San Juan county.
SECTION 282. BECLABITO CHAPTER HELIPAD CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 79 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 193 to plan, design and construct a helipad in the Beclabito chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 283. BECLABITO CHAPTER HELIPAD CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 83 of Section 33 of Chapter 138 of Laws 2021 to plan, design and construct a helipad in the Beclabito chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 284. EAST BLANCO BOULEVARD IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 79 of Section 33 of Chapter 138 of Laws 2021 to plan, design and construct improvements to east Blanco boulevard, including bridge replacement and drainage, in Bloomfield in San Juan county is extended through fiscal year 2027.
SECTION 285. NORTH FARMINGTON DITCH IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 17 of Section 28 of Chapter 138 of Laws 2021 to plan, design and construct improvements to the north Farmington ditch in Farmington in San Juan county is extended through fiscal year 2027.
SECTION 286. NAVAJO PREPARATORY SCHOOL SECURITY SYSTEM INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 61 of Section 25 of Chapter 138 of Laws 2021 to purchase and install improvements, including cameras, keyless entry systems, computers and servers, at Navajo preparatory school in Farmington in San Juan county is extended through fiscal year 2027.
SECTION 287. SAN JUAN COLLEGE SCHOOL BUS PURCHASE--CHANGE TO PASSENGER BUS PURCHASE--GENERAL FUND.--The unexpended balance of the appropriation to the higher education department in Subsection 12 of Section 15 of Chapter 66 of Laws 2024 to purchase and equip a school bus for a school bus driver training program at San Juan college in Farmington in San Juan county shall not be expended for the original purpose but is changed to purchase and equip a passenger bus that carries more than sixteen passengers, including the driver, for the purpose of training school bus drivers at San Juan college in Farmington in San Juan county.
SECTION 288. HUERFANO CHAPTER POWER LINE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 63 of Section 25 of Chapter 138 of Laws 2021 to acquire easements and rights of way for and to plan, design and construct scattered power lines in the Huerfano chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 289. NASCHITTI CHAPTER POWER LINE EXTENSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 85 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 204 to acquire rights of way and easements, to plan and design archaeological and environmental studies and to plan, design and construct power line extensions in the Naschitti chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 290. NAVAJO ROUTE 5001 AND UNITED STATES HIGHWAY 491 INTERSECTION STREETLIGHT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 85 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct, purchase and install solar streetlights at the main intersection of United States highway 491 and Navajo route 5001 in the Newcomb chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 291. RED VALLEY CHAPTER MITTEN ROCK POWER LINE CONSTRUCTION--CHANGE TO RED VALLEY CHAPTER MITTEN ROCK TRANSFER STATION CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department originally authorized in Subsection 87 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 202 to acquire easements and rights of way for and to plan, design and construct power lines to homes on the New Mexico side of the state line in the Mitten Rock area of the Red Valley chapter of the Navajo Nation in San Juan county shall not be expended for the original purpose but is changed to plan, design, construct and equip the Mitten Rock transfer station in the Red Valley chapter of the Navajo Nation in San Juan county. The time of expenditure is extended through fiscal year 2027.
SECTION 292. DINE COLLEGE NORTH SHIPROCK CAMPUS GYMNASIUM HEATING, VENTILATION AND AIR CONDITIONING SYSTEM REPLACEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the higher education department project in Subsection 15 of Section 34 of Chapter 138 of Laws 2021 to plan, design, construct, replace, purchase and install a heating, ventilation and air conditioning system in the gymnasium at the north Shiprock campus of Dine college in San Juan county is extended through fiscal year 2027.
SECTION 293. NAVAJO NATION RENEWABLE ENERGY SYSTEM CONSTRUCTION--CHANGE TO SHIPROCK INCIDENT COMMAND CENTER CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department originally authorized in Subsection 56 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 161 to plan, design, construct, purchase, equip and install renewable energy systems for the Navajo Nation in McKinley, San Juan and Sandoval counties shall not be expended for the original purpose but is changed to plan, design, construct and equip the Shiprock incident command center in the Shiprock chapter of the Navajo Nation in San Juan county. The time of expenditure is extended through fiscal year 2027.
SECTION 294. SHIPROCK CHAPTER SENIOR CENTER PARKING LOT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 10 of Section 5 of Chapter 53 of Laws 2022 to plan, design, construct and repair the Shiprock senior center parking lot in the Shiprock chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 295. SHIPROCK CHAPTER SENIOR CENTER PARKING LOT CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the aging and long-term services department project in Laws 2022, Chapter 53, Section 46 to plan, design, construct and repair the Shiprock senior center parking lot in the Shiprock chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 296. NEW MEXICO HIGHWAY 134 AND UNITED STATES HIGHWAY 491 INTERSECTION SAFETY IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 86 of Section 33 of Chapter 138 of Laws 2021 to plan, design and construct road safety improvements, including traffic lights and signage, for the intersection of New Mexico highway 134 and United States highway 491 in the Tooh Haltsooi chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 297. TOOH HALTSOOI CHAPTER POWER LINE EXTENSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 78 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 210 to acquire rights of way for and to plan, design and construct power line extensions, including archaeological and environmental studies, for the Tooh Haltsooi chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 298. TSE'DAA'KAAN CHAPTER HOGBACK SENIOR CENTER IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the aging and long-term services department project originally authorized in Subsection 46 of Section 4 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 211 to plan, design and construct improvements to the Hogback senior center in the Tse'Daa'Kaan chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 299. TSE'DAA'KAAN CHAPTER POWER LINE EXTENSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 93 of Section 31 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 189 to plan, design and construct power line extensions in the Tse'Daa'Kaan chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 300. UPPER FRUITLAND CHAPTER SENIOR CENTER IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the aging and long-term services department project originally authorized in Subsection 48 of Section 4 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 190 to plan, design, construct, furnish and equip phase 2 of a senior center, including an addition, for the Upper Fruitland chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 301. WHITE ROCK CHAPTER POWER LINE EXTENSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 23 of Section 48 of Chapter 138 of Laws 2021 to plan, design and construct scattered power line extensions in the White Rock chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 302. SHIPROCK INDUSTRIAL PARK SOLAR STREET LIGHT IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 68 of Section 25 of Chapter 138 of Laws 2021 to plan, design, construct, purchase and equip solar street lights at the Shiprock industrial park in Shiprock in the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 303. ACEQUIA DE LOS VECINOS DE LOS VALLECITOS WEST CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 18 of Section 28 of Chapter 138 of Laws 2021 to plan, design, construct, equip and install improvements for the acequia de los Vecinos de los Vallecitos west in San Miguel county is extended through fiscal year 2027.
SECTION 304. ACEQUIA MADRE DE EL CERRITO IMPROVEMENT--CHANGE TO PIPELINE PURCHASE AND ACEQUIA IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the interstate stream commission originally authorized in Subsection 39 of Section 27 of Chapter 199 of Laws 2023 and reauthorized in Laws 2024, Chapter 65, Section 189 to plan, design, construct, improve and equip the acequia Madre de el Cerrito in San Miguel county shall not be expended for the original or reauthorized purpose but is changed to purchase and install pipeline and to plan, design, construct, improve and equip the acequia Madre de el Cerrito. The time of expenditure is extended through fiscal year 2027.
SECTION 305. ACEQUIA MADRE DE LOS ROMEROS IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 22 of Section 28 of Chapter 138 of Laws 2021 to plan, design and construct improvements for the acequia Madre de los Romeros in San Miguel county is extended through fiscal year 2027.
SECTION 306. PENDARIES VILLAGE MUTUAL DOMESTIC WATER CONSUMERS ASSOCIATION WATER SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 67 of Section 21 of Chapter 138 of Laws 2021 to plan, design and construct water supply lines and well construction projects for the Pendaries village mutual domestic water consumers association in San Miguel county is extended through fiscal year 2027.
SECTION 307. SAN MIGUEL COUNTY DRUG TREATMENT FACILITY FURNITURE AND EQUIPMENT INSTALLATION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 376 of Section 28 of Chapter 199 of Laws 2023 to purchase and install fixtures, furniture and equipment at a drug treatment facility in San Miguel county is extended through fiscal year 2027.
SECTION 308. SAN MIGUEL COUNTY EMERGENCY OPERATIONS CENTER LAPTOPS PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 387 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip laptops for the emergency operations center in the office of emergency management in San Miguel county is extended through fiscal year 2027.
SECTION 309. SAN MIGUEL COUNTY RADIO SYSTEM PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 378 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip radio systems for the sheriff's office in San Miguel county is extended through fiscal year 2027.
SECTION 310. SAN MIGUEL COUNTY VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 380 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip vehicles for San Miguel county is extended through fiscal year 2027.
SECTION 311. TECOLOTE ACEQUIA ASSOCIATION ACEQUIA IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the interstate stream commission project originally authorized in Subsection 41 of Section 33 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 218 to plan, design and construct improvements for the Tecolote acequia association in San Miguel county is extended through fiscal year 2027.
SECTION 312. LAS VEGAS EIGHTH STREET WATER LINE EXTENSION--CHANGE TO PURCHASE VEHICLES AND EQUIPMENT--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of environment in Subsection 91 of Section 22 of Chapter 53 of Laws 2022 to plan, design and construct a water line along Eighth street north of Mills avenue in Las Vegas in San Miguel county shall not be expended for the original purpose but is appropriated to the local government division to purchase and equip vehicles and equipment for the utilities department in Las Vegas in San Miguel county. The time of expenditure is extended through fiscal year 2027.
SECTION 313. LAS VEGAS VETERANS OF FOREIGN WARS BUILDING RENOVATION--CHANGE TO IMPROVE VETERANS PARK--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 450 of Section 28 of Chapter 66 of Laws 2024 to plan, design, construct and renovate the Las Vegas veterans of foreign wars building, including heating, ventilation and air conditioning systems, and to purchase and install equipment, including commemorative bricks, in Las Vegas in San Miguel county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, furnish and equip improvements to Veterans park in Las Vegas in San Miguel county.
SECTION 314. LUNA COMMUNITY COLLEGE MOBILE MEDICAL CLASSROOM EQUIPMENT PURCHASE--CHANGE TO ALLIED HEALTH BUILDING RENOVATION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the higher education department in Subsection 21 of Section 15 of Chapter 199 of Laws 2023 to purchase and equip a mobile medical classroom for the department of allied health and public service at Luna community college in Las Vegas in San Miguel county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, furnish and equip the allied health building, including accessibility and heating, ventilation and air conditioning system improvements, at Luna community college in Las Vegas in San Miguel county. The time of expenditure is extended through fiscal year 2027.
SECTION 315. NEW MEXICO HIGHLANDS UNIVERSITY SININGER HALL RENOVATION--CHANGE TO FACILITY SERVICES BUILDING RENOVATION--GENERAL FUND.--The unexpended balance of the appropriation to the board of regents of New Mexico highlands university in Subsection 4 of Section 35 of Chapter 199 of Laws 2023 to plan, design, construct, renovate and equip Sininger hall at New Mexico highlands university in Las Vegas in San Miguel county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, furnish and equip a facility services building at New Mexico highlands university in Las Vegas in San Miguel county.
SECTION 316. SAN MIGUEL COUNTY PASSENGER VAN PURCHASE--EXPAND PURPOSE--EXTEND TIME--GENERAL FUND.--The local government division project in Subsection 388 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip passenger vans for after-school and summer programs in Las Vegas in San Miguel county may include purchasing and equipping buses. The time of expenditure is extended through fiscal year 2027.
SECTION 317. PECOS WATER TANK CONSTRUCTION--CHANGE TO PECOS WATER AND WASTEWATER SYSTEM IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the department of environment in Subsection 77 of Section 20 of Chapter 66 of Laws 2024 to plan, design, construct and equip a water storage tank for the Benedictine monastery in Pecos in San Miguel county shall not be expended for the original purpose but is changed to plan, design, construct and improve water and wastewater systems, including water tanks, in Pecos in San Miguel county. The time of expenditure is extended through fiscal year 2027.
SECTION 318. VALLEY ELEMENTARY AND MIDDLE SCHOOL HEALTH CENTER RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the public education department project in Subsection 165 of Section 17 of Chapter 138 of Laws 2021 to plan, design, construct and renovate existing space for a health center at Valley elementary and middle schools in the West Las Vegas public school district in San Miguel county is extended through fiscal year 2027.
SECTION 319. GARCIA LUCERO ACEQUIA ASSOCIATION IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the interstate stream commission project originally authorized in Subsection 46 of Section 33 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 225 to plan, design, construct and equip improvements to the Garcia Lucero acequia association in Sandoval county is extended through fiscal year 2027.
SECTION 320. LA JARA WATER USERS' ASSOCIATION WATER SYSTEM IMPROVEMENT--CHANGE TO LA JARA MUTUAL DOMESTIC WATER CONSUMERS' AND MUTUAL SEWAGE WORKS ASSOCIATION WATER SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of environment in Subsection 70 of Section 21 of Chapter 138 of Laws 2021 to plan, design and construct water system improvements for La Jara water users' association in Sandoval county shall not be expended for the original purpose but is changed to plan, design and construct water system improvements for La Jara mutual domestic water consumers' and mutual sewage works association in Sandoval county. The time of expenditure is extended through fiscal year 2027.
SECTION 321. PENA BLANCA WATER AND SANITATION DISTRICT WATER SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.-- The time of expenditure for the department of environment project in Subsection 71 of Section 21 of Chapter 138 of Laws 2021 to plan, design and construct water system improvements, including water lines, pressure-reducing valve stations and fire hydrants, for the Pena Blanca water and sanitation district in Sandoval county is extended through fiscal year 2027.
SECTION 322. PLACITAS SENIOR CENTER PLAN AND DESIGN--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 46 of Section 5 of Chapter 138 of Laws 2021 to plan and design the Placitas senior center in Sandoval county is extended through fiscal year 2027.
SECTION 323. SAN ANTONIO DE LAS HUERTAS LAND GRANT-MERCED COMMUNITY BUILDING CONSTRUCTION--EXTEND TIME--GENERAL FUND.-- The time of expenditure for the local government division project originally authorized in Subsection 380 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2021, Chapter 139, Section 67 and reauthorized again in Laws 2023, Chapter 203, Section 228 to plan, design, construct, purchase, renovate, furnish and equip a community building for the San Antonio de las Huertas land grant-merced in Sandoval county is extended through fiscal year 2027.
SECTION 324. SANDOVAL COUNTY THIRTEENTH JUDICIAL DISTRICT COURTHOUSE CONSTRUCTION--CHANGE AGENCY--GENERAL FUND.--The agency for the office of the district attorney of the thirteenth judicial district project in Laws 2024, Chapter 66, Section 12 to plan, design, construct, furnish and expand the thirteenth judicial district courthouse in Sandoval county is changed to the thirteenth judicial district court.
SECTION 325. EDGEWOOD WASTEWATER TREATMENT PLANT CONSTRUCTION--CHANGE TO SANDOVAL COUNTY ANIMAL SHELTER CONSTRUCTION--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--Twenty-one percent of the unexpended balance of the department of environment project in Subsection 85 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct and equip a wastewater treatment plant for Edgewood in Santa Fe county shall not be expended for the original purpose but is appropriated to the local government division to acquire land for and to plan, design, construct and equip an animal shelter in Sandoval county. The time of expenditure is extended through fiscal year 2027.
SECTION 326. COCHITI PUEBLO PLAZA HOUSING RENOVATION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 23 of Section 47 of Chapter 53 of Laws 2022 to plan, design, construct and renovate housing in the council-designated historic area of the plaza in the Pueblo of Cochiti in Sandoval county is extended through fiscal year 2027.
SECTION 327. COCHITI PUEBLO SENIOR CENTER IMPROVEMENT AND VEHICLE PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 43 of Section 5 of Chapter 138 of Laws 2021 to plan, design and construct improvements, including lighting, parking, entry, garage, patio, bathrooms, kitchen and roof repair and replacement, and to purchase and equip vehicles for the senior center in the Pueblo of Cochiti in Sandoval county is extended through fiscal year 2027.
SECTION 328. COCHITI PUEBLO SENIOR CENTER ROOF IMPROVEMENT AND VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.-- The time of expenditure for the aging and long-term services department project in Subsection 1 of Section 45 of Chapter 138 of Laws 2021 to plan, design and construct improvements, including lighting, parking, entry, garage, patio, bathrooms, kitchen and roof repair and replacement, and to purchase and equip vehicles for the senior center in the Pueblo of Cochiti in Sandoval county is extended through fiscal year 2027.
SECTION 329. CORRALES WEST MEADOWLARK LANE TRAIL CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 322 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct the west Meadowlark lane trail in Corrales in Sandoval county is extended through fiscal year 2027.
SECTION 330. SANDOVAL COUNTY RIDING CENTER VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 409 of Section 28 of Chapter 199 of Laws 2023 and reauthorized in Laws 2024, Chapter 65, Section 195 to purchase vehicles and equipment for a therapeutic riding facility in Corrales in Sandoval county is extended through fiscal year 2027.
SECTION 331. JEMEZ PUEBLO GLOBAL POSITIONING SYSTEM UNIT EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 127 of Section 25 of Chapter 199 of Laws 2023 to purchase, equip and install a global positioning system unit for the Pueblo of Jemez in Sandoval county is extended through fiscal year 2027.
SECTION 332. JEMEZ PUEBLO SEWER JETTER EQUIPMENT PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project in Subsection 104 of Section 19 of Chapter 199 of Laws 2023 to purchase and equip a sewer jetter for the Pueblo of Jemez in Sandoval county is extended through fiscal year 2027.
SECTION 333. IDALIA ROAD AND LOMA COLORADO BOULEVARD CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 92 of Section 33 of Chapter 138 of Laws 2021 to plan, design and construct intersection improvements at Idalia road and Loma Colorado boulevard in Rio Rancho in Sandoval county is extended through fiscal year 2027.
SECTION 334. SOUTHERN SANDOVAL COUNTY ARROYO FLOOD CONTROL AUTHORITY INDUSTRIAL PARK WATER FACILITY CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 74 of Section 21 of Chapter 138 of Laws 2021 to plan, design and construct a water quality facility for an industrial park for the southern Sandoval county arroyo flood control authority in Sandoval county is extended through fiscal year 2027.
SECTION 335. ENCHANTED HILLS ELEMENTARY SCHOOL FIRE PROTECTION SYSTEM IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the public education department project in Subsection 193 of Section 16 of Chapter 199 of Laws 2023 to plan, design, purchase and install a fire protection system for Enchanted Hills elementary school in the Rio Rancho public school district in Sandoval county is extended through fiscal year 2027.
SECTION 336. ZIA PUEBLO HEALTH AND WELLNESS CENTER CONSTRUCTION--CHANGE TO GAS STATION CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 142 of Section 25 of Chapter 199 of Laws 2023 to plan, design, construct and equip a health and wellness center for the Pueblo of Zia in Sandoval county shall not be expended for the original purpose but is changed to plan, design, construct and equip a gas station for the Pueblo of Zia in Sandoval county.
SECTION 337. ACEQUIA DE LA OTRA BANDA IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the interstate stream commission project originally authorized in Subsection 54 of Section 33 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 234 to plan, design and construct improvements to the acequia de la Otra Banda in Santa Fe county is extended through fiscal year 2027.
SECTION 338. ACEQUIA DEL BARRANCO ALTO IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the interstate stream commission project originally authorized in Subsection 56 of Section 33 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 236 to plan, design and construct improvements to the acequia del Barranco Alto in Santa Fe county is extended through fiscal year 2027.
SECTION 339. ACEQUIA DEL CANO IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 27 of Section 28 of Chapter 138 of Laws 2021 to plan, design and construct improvements to the acequia del Cano in Santa Fe county is extended through fiscal year 2027.
SECTION 340. ELDORADO AREA WATER AND SANITATION DISTRICT HEAVY EQUIPMENT PURCHASE--EXPAND PURPOSE--GENERAL FUND.--The local government division project in Subsection 583 of Section 28 of Chapter 66 of Laws 2024 to purchase and equip heavy equipment, including a backhoe, dump truck and fleet maintenance truck, for the Eldorado area water and sanitation district in Santa Fe county may include the purchase of a generator.
SECTION 341. LA BAJADA COMMUNITY DITCH AND MUTUAL DOMESTIC WATER ASSOCIATION WATER LINE CONSTRUCT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 81 of Section 21 of Chapter 138 of Laws 2021 to plan, design and construct water lines, including tank connections, for La Bajada community ditch and mutual domestic water association in Santa Fe county is extended through fiscal year 2027.
SECTION 342. LA BAJADA COMMUNITY DITCH AND MUTUAL DOMESTIC WATER ASSOCIATION HYDRANT AND METER INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 80 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct, purchase, equip and install fire hydrants and meters related to a well for La Bajada community ditch and mutual domestic water association in Santa Fe county is extended through fiscal year 2027.
SECTION 343. LA BAJADA MUTUAL DOMESTIC WATER CONSUMERS ASSOCIATION WATER SYSTEM IMPROVEMENT--CHANGE TO LA BAJADA COMMUNITY DITCH AND MUTUAL DOMESTIC WATER ASSOCIATION WATER SYSTEM IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the department of environment originally authorized in Subsection 120 of Section 26 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 240 to plan, design and construct water system improvements for La Bajada mutual domestic water consumers association in Santa Fe county shall not be expended for the original or reauthorized purpose but is changed to plan, design and construct water system improvements for La Bajada community ditch and mutual domestic water association in Santa Fe county. The time of expenditure is extended through fiscal year 2027.
SECTION 344. SANTA FE COUNTY EDGEWOOD FIRE STATION IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 337 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2023, Chapter 203, Section 247 to plan, design, construct, furnish, equip and improve fire stations in the Edgewood fire district in Santa Fe county is extended through fiscal year 2027.
SECTION 345. SANTA FE COUNTY ESPERANZA SHELTER SOLAR PANEL INSTALLATION--CHANGE TO SANTA FE COUNTY FACILITIES SOLAR PANEL INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 402 of Section 30 of Chapter 53 of Laws 2022 to plan, design and construct a roof replacement and to purchase and install solar panels at the Esperanza shelter in Santa Fe in Santa Fe county shall not be expended for the original purpose but is changed to plan, design, construct, purchase and install solar panels at county facilities in Santa Fe county. The time of expenditure is extended through fiscal year 2027.
SECTION 346. SANTA FE COUNTY LA CIENEGA WATER MASTER PLAN--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 83 of Section 21 of Chapter 138 of Laws 2021 for a master plan and a preliminary engineering report to evaluate existing water infrastructure, to examine uses and impacts and to identify the best methods for increasing flows in La Cienega springs and traditional water sources for La Cienega in Santa Fe county is extended through fiscal year 2027.
SECTION 347. SANTA FE COUNTY POJOAQUE DISTRICT FIRE STATION CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 393 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 306 to plan, design, construct, improve, furnish and equip fire stations in the Pojoaque fire district in Santa Fe county is extended through fiscal year 2027.
SECTION 348. TEODORO Y TEODORA DITCH IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the interstate stream commission project originally authorized in Subsection 53 of Section 33 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 243 to plan, design and construct improvements to the Teodoro y Teodora ditch in Santa Fe county is extended through fiscal year 2027.
SECTION 349. TESUQUE PUEBLO WATER DISTRIBUTION SYSTEM CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 29 of Section 48 of Chapter 138 of Laws 2021 to plan, design and construct a drinking water delivery and fire protection system for the Pueblo of Tesuque in Santa Fe county is extended through fiscal year 2027.
SECTION 350. UNITED STATES HIGHWAY 84/285 NOISE MITIGATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 96 of Section 33 of Chapter 138 of Laws 2021 to plan, design and construct a road noise mitigation project for United States highway 84/285 north of Santa Fe in Santa Fe county is extended through fiscal year 2027.
SECTION 351. AGUA FRIA COMMUNITY WATER SYSTEM ASSOCIATION TRANSFERS AND WATER SYSTEM IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 135 of Section 40 of Chapter 277 of Laws 2019 and reauthorized to the department of environment in Laws 2023, Chapter 203, Section 238 to acquire water rights, including applications and transfers, and to plan, design and construct improvements to water distribution systems, including well and water line extensions, for the Agua Fria community water system association in Santa Fe county is extended through fiscal year 2027.
SECTION 352. AGUA FRIA COMMUNITY WATER SYSTEM ASSOCIATION WATER RIGHTS ACQUISITION AND WATER SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project originally authorized in Subsection 97 of Section 33 of Chapter 138 of Laws 2021 and appropriated to the department of environment in Laws 2023, Chapter 203, Section 237 to acquire water rights, including applications and transfers, and to plan, design and construct improvements to water distribution systems, including well and water line extensions, for the Agua Fria community water system association in Santa Fe county is extended through fiscal year 2027.
SECTION 353. AGUA FRIA COMMUNITY WATER SYSTEM ASSOCIATION WATER DISTRIBUTION SYSTEM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 77 of Section 21 of Chapter 138 of Laws 2021 to acquire water rights, including applications and transfers, and to plan, design and construct improvements to water distribution systems, including wells and water line extensions, for the Agua Fria community water system association in Santa Fe county is extended through fiscal year 2027.
SECTION 354. MADRID WATER MUTUAL DOMESTIC WATER CONSUMERS ASSOCIATION FIRE SUPPRESSION TANK CONSTRUCTION--CHANGE TO SANTA FE COUNTY MADRID COMMUNITY WATER SYSTEM TEST WELL CONSTRUCTION--CHANGE AGENCY--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 384 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 241 to plan, design, construct, purchase, equip and install a non-pressurized underground fire suppression tank for the Madrid water mutual domestic water consumers association in Santa Fe county shall not be expended for the original or reauthorized purpose but is appropriated to the department of environment to plan, design, construct, improve and equip test water wells for the community water system in Madrid in Santa Fe county. The time of expenditure is extended through fiscal year 2027.
SECTION 355. SANTA FE COUNTY MADRID FIRE SUPPRESSION SYSTEM CONSTRUCTION--CHANGE TO SANTA FE COUNTY MADRID COMMUNITY WATER SYSTEM TEST WELL CONSTRUCTION--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 339 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, improve and equip the fire suppression system in the Madrid area in Santa Fe county shall not be expended for the original purpose but is appropriated to the department of environment to plan, design, construct, improve and equip test water wells for the community water system in Madrid in Santa Fe county. The time of expenditure is extended through fiscal year 2027.
SECTION 356. NAMBE PUEBLO SENIOR CENTER IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the aging and long-term services department project in Subsection 2 of Section 45 of Chapter 138 of Laws 2021 to plan, design, construct, improve, furnish and equip a senior center in the Pueblo of Nambe in Santa Fe county is extended through fiscal year 2027.
SECTION 357. SANTA FE COUNTY ABEDON LOPEZ SENIOR CENTER UPGRADE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 50 of Section 5 of Chapter 138 of Laws 2021 to plan, design, construct, upgrade and equip the Abedon Lopez senior center in Santa Cruz in Santa Fe county is extended through fiscal year 2027.
SECTION 358. CHILDREN, YOUTH AND FAMILIES DEPARTMENT PUBLIC EMPLOYEES RETIREMENT ASSOCIATION BUILDING RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the capital program fund project in Subsection 4 of Section 9 of Chapter 138 of Laws 2021 to plan, design, construct, renovate, furnish and equip facilities for the children, youth and families department at the public employees retirement association building in Santa Fe in Santa Fe county is extended through fiscal year 2027.
SECTION 359. DEPARTMENT OF HEALTH FORT BAYARD WATER INFRASTRUCTURE IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the capital program fund project originally authorized in Subsection 4 of Section 7 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 110 to plan, design, construct, improve, renovate, repair, remediate, furnish and equip infrastructure extending from springs located in the Gila national forest to the old Fort Bayard water tanks and to certify code compliance to provide water to the current Fort Bayard medical facility in Grant county is extended through fiscal year 2027.
SECTION 360. GOVERNOR MILES ROAD IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 98 of Section 33 of Chapter 138 of Laws 2021 to acquire rights of way and to plan, design, construct and improve pedestrian, bicycle and drainage infrastructure on Governor Miles road in Santa Fe in Santa Fe county is extended through fiscal year 2027.
SECTION 361. JOHN F. SIMMS BUILDING RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the capital program fund project in Subsection 8 of Section 9 of Chapter 138 of Laws 2021 to plan, design, construct, renovate and improve the John F. Simms building in Santa Fe in Santa Fe county is extended through fiscal year 2027.
SECTION 362. LA BAJADA COMMUNITY DITCH IMPROVEMENT--CHANGE TO LA BAJADA COMMUNITY DITCH AND MUTUAL DOMESTIC WATER ASSOCIATION ACEQUIA IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the interstate stream commission originally authorized in Subsection 59 of Section 33 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 239 to plan, design, construct, repair, rehabilitate and improve La Bajada community ditch in the La Bajada area of Santa Fe county shall not be expended for the original or reauthorized purpose but is changed to plan, design, construct, repair, rehabilitate and improve La Bajada community ditch for La Bajada community ditch and mutual domestic water association in the La Bajada area of Santa Fe county. The time of expenditure is extended through fiscal year 2027.
SECTION 363. LA BAJADA COMMUNITY DITCH AND MUTUAL DOMESTIC WATER ASSOCIATION BROADBAND CONSTRUCTION--CHANGE TO FIRE HYDRANT AND METER INSTALLATION--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 395 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct broadband connections for La Bajada community ditch and mutual domestic water association in Santa Fe county shall not be expended for the original purpose but is appropriated to the department of environment to plan, design, construct, purchase, equip and install fire hydrants and meters for La Bajada community ditch and mutual domestic water association in Santa Fe county. The time of expenditure is extended through fiscal year 2027.
SECTION 364. NAMBE PUEBLO SENIOR CENTER IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 49 of Section 5 of Chapter 138 of Laws 2021 to plan, design, construct, furnish and equip facility improvements to the Nambe Pueblo senior center in the Pueblo of Nambe in Santa Fe county is extended through fiscal year 2027.
SECTION 365. NEW MEXICO HIGHWAY 118 IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 96 of Section 40 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 137 to plan, design and construct road improvements along New Mexico highway 118 for the Church Rock chapter of the Navajo Nation in McKinley county is extended through fiscal year 2027.
SECTION 366. NEW MEXICO SCHOOL FOR THE DEAF CENTRAL PLANT AND JAMES A. LITTLE THEATER IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the New Mexico school for the deaf project in Laws 2021, Chapter 138, Section 12 to plan, design, construct, renovate, furnish and equip facilities, including abatement, at the James A. Little theater building, central plant and associated site areas at the New Mexico school for the deaf in Santa Fe in Santa Fe county is extended through fiscal year 2027.
SECTION 367. SANTA FE COUNTY SHERIFF LICENSE PLATE READER PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 431 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip police mobile camera license plate readers, including fixed and mobile systems and related technology, for the county sheriff in Santa Fe county is extended through fiscal year 2027.
SECTION 368. SANTA FE FIRE STATION 2 CONSTRUCTION--CHANGE TO SANTA FE FIRE STATION IMPROVEMENT--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 492 of Section 28 of Chapter 66 of Laws 2024 to plan, design, construct, furnish and equip fire station 2, including related infrastructure, in Santa Fe in Santa Fe county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, furnish and equip fire station facilities in Santa Fe in Santa Fe county.
SECTION 369. SANTA FE FIRE STATION 2 CONSTRUCTION--CHANGE TO FIRE STATION RENOVATION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 447 of Section 28 of Chapter 199 of Laws 2023 to plan, design, construct, furnish and equip fire station 2, including infrastructure, for Santa Fe in Santa Fe county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, furnish and equip fire station facilities in Santa Fe in Santa Fe county. The time of expenditure is extended through fiscal year 2027.
SECTION 370. SANTA FE HOMEBOUND MEALS PROGRAM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 340 of Section 29 of Chapter 138 of Laws 2021 to plan, design, renovate, construct, improve and equip a facility for a meals program serving homebound and special needs individuals in Santa Fe in Santa Fe county is extended through fiscal year 2027.
SECTION 371. SANTA FE MIDTOWN INFRASTRUCTURE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 344 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct and improve infrastructure for the midtown Santa Fe property in Santa Fe in Santa Fe county is extended through fiscal year 2027.
SECTION 372. SANTA FE PARKS IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 341 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, repair, improve and equip parks in Santa Fe in Santa Fe county is extended through fiscal year 2027.
SECTION 373. SANTA FE SOUTHSIDE TEEN CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 342 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, furnish and equip a teen and resource center on the south side of Santa Fe in Santa Fe county is extended through fiscal year 2027.
SECTION 374. SANTA FE CAPITOL CAMPUS MASTER PLAN IMPLEMENTATION--CHANGE TO SANTA FE STATE BUILDING RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the capital program fund in Subsection 7 of Section 9 of Chapter 138 of Laws 2021 to plan, design, construct, renovate, remediate, furnish and equip state buildings located on the capitol campus to implement the Santa Fe master plan in Santa Fe county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, remediate, furnish and equip state buildings in Santa Fe in Santa Fe county. The time of expenditure is extended through fiscal year 2027.
SECTION 375. SANTA FE SOUTHWEST ACTIVITY NODE PARK PHASE 2 IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project originally authorized in Subsection 407 of Section 34 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 261 to plan, design, construct, furnish and equip phase 2 improvements at Southwest Activity Node park in Santa Fe in Santa Fe county is extended through fiscal year 2027.
SECTION 376. SUPREME COURT BUILDING RENOVATION--CHANGE AGENCY--GENERAL FUND.--The agency for the capital program fund project in Subsection 8 of Section 6 of Chapter 66 of Laws 2024 to plan, design, construct, renovate, repair, furnish and equip improvements to the supreme court, including elevator, electrical, heating, cooling and ventilation systems, in Santa Fe in Santa county is changed to the supreme court building commission.
SECTION 377. SANTA FE INDIAN SCHOOL WIDE AREA NETWORK CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 36 of Section 48 of Chapter 138 of Laws 2021 to continue the construction of a regional middle-mile education network employing fiber-optic construction, point-to-point wireless and leased dark fiber, where appropriate, for an internet exchange, network, security and data operation center that connects tribes and educational entities through a wide area network at the Santa Fe Indian school in Santa Fe in Santa Fe county is extended through fiscal year 2027.
SECTION 378. TESUQUE PUEBLO STORM DRAINAGE SYSTEM CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of transportation project originally authorized in Subsection 140 of Section 40 of Chapter 277 of Laws 2019 to plan, design and construct a storm drainage system in the Pueblo of Tesuque in Santa Fe county and appropriated to the Indian affairs department in Laws 2023, Chapter 203, Section 264 for that purpose is extended through fiscal year 2027.
SECTION 379. TESUQUE PUEBLO WATER SYSTEM IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 26 of Section 48 of Chapter 138 of Laws 2021 to plan, design and construct water system improvements, including a source-to-storage water line, for the Pueblo of Tesuque in Santa Fe county is extended through fiscal year 2027.
SECTION 380. SPACEPORT AMERICA MASTER PLANNING AND PAYLOAD FACILITY CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the spaceport authority project originally authorized in Subsection 54 of Section 5 of Chapter 73 of Laws 2018 and reauthorized in Item (64) of Section 5 of Chapter 271 of Laws 2019 and reauthorized again in Laws 2020, Chapter 82, Section 95 and reauthorized again in Laws 2023, Chapter 203, Section 268 for master planning and to plan, design, construct and equip a payload processing center, an information technology building and a visitor access control facility at spaceport America in Sierra county is extended through fiscal year 2027.
SECTION 381. SPACEPORT AMERICA IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the spaceport authority project originally appropriated in Laws 2019, Chapter 277, Section 38 and reauthorized in Laws 2021, Chapter 139, Section 79 and reauthorized again in Laws 2023, Chapter 203, Section 266 to plan, design, construct and make improvements at spaceport America in Sierra county, to include funding for operating expenses of up to one million seven hundred fifty thousand dollars ($1,750,000), notwithstanding any restrictions otherwise limiting the use of those funds for indirect costs, is extended through fiscal year 2026.
SECTION 382. TRUTH OR CONSEQUENCES KEN JAMES SENIOR CENTER VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the aging and long-term services department project in Subsection 59 of Section 4 of Chapter 199 of Laws 2023 to purchase and equip vehicles for the Ken James senior center in Truth or Consequences in Sierra county is extended through fiscal year 2027.
SECTION 383. KEN JAMES SENIOR CENTER RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 52 of Section 5 of Chapter 138 of Laws 2021 for renovations to the Ken James senior center in Truth or Consequences in Sierra county is extended through fiscal year 2027.
SECTION 384. ALAMO CHAPTER STORAGE BUILDING CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 117 of Section 25 of Chapter 138 of Laws 2021 to plan, design, purchase and construct a food and water storage and distribution building, including a loading dock and security fencing, in the Alamo chapter of the Navajo Nation in Socorro county is extended through fiscal year 2027.
SECTION 385. ALAMO CHAPTER DUMP TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the Indian affairs department project in Subsection 164 of Section 25 of Chapter 199 of Laws 2023 to purchase and equip a dump truck for the Alamo chapter of the Navajo Nation in Socorro county is extended through fiscal year 2027.
SECTION 386. MAGDALENA BENJAMIN WELL IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 89 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct and improve Benjamin well, including a booster pump and water storage tank, in Magdalena in Socorro county is extended through fiscal year 2027.
SECTION 387. MAGDALENA SENIOR CENTER IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 55 of Section 5 of Chapter 138 of Laws 2021 for improvements to the facility to address code compliance issues and for the purchase and installation of equipment and building systems at the Magdalena senior center in Socorro county is extended through fiscal year 2027.
SECTION 388. SOCORRO EAGLE PICHER SUPERFUND SITE MULTIPURPOSE BUILDING CONSTRUCTION--CHANGE TO INDUSTRIAL PARK SITE MULTIPURPOSE BUILDING CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 515 of Section 28 of Chapter 66 of Laws 2024 to plan, design, construct, purchase and equip a multipurpose building for commercial and industrial development on a remediated United States environmental protection agency superfund site near Socorro in Socorro county shall not be expended for the original purpose but is changed to plan, design, construct, purchase and equip a multipurpose building in an industrial park in Socorro in Socorro county.
SECTION 389. CHILDREN, YOUTH AND FAMILIES DEPARTMENT FACILITY IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the capital program fund project in Subsection 10 of Section 9 of Chapter 138 of Laws 2021 to plan, design, construct, improve, renovate, furnish and equip facilities for the children, youth and families department statewide is extended through fiscal year 2027.
SECTION 390. DEPARTMENT OF INFORMATION TECHNOLOGY BROADBAND IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of information technology project in Subsection 1 of Section 26 of Chapter 138 of Laws 2021 to plan, design, engineer, construct, purchase and equip broadband infrastructure statewide, provided that no more than five hundred thousand dollars ($500,000) shall be expended until the department of information technology submits an expenditure plan to the legislative finance committee, is extended through fiscal year 2027.
SECTION 391. DEPARTMENT OF INFORMATION TECHNOLOGY RURAL BROADBAND INFRASTRUCTURE DEVELOPMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of information technology project originally authorized in Subsection 4 of Section 32 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 280 for broadband expansion, including assessments and contracts, in rural areas statewide is extended through fiscal year 2027.
SECTION 392. DEPARTMENT OF INFORMATION TECHNOLOGY STATEWIDE LIBRARY BROADBAND EXPANSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of information technology project originally authorized in Subsection 6 of Section 32 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 286 for statewide library broadband expansion and improvement, contingent upon the execution of a memorandum of understanding for use of the funds with the cultural affairs department, is extended through fiscal year 2027.
SECTION 393. EARLY CHILDHOOD EDUCATION AND CARE DEPARTMENT PUBLIC EMPLOYEES RETIREMENT ASSOCIATION BUILDING RENOVATION--CHANGE TO INFRASTRUCTURE IMPROVEMENTS STATEWIDE--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the capital program fund in Subsection 6 of Section 9 of Chapter 138 of Laws 2021 to plan, design, construct, renovate, furnish and equip facilities for the early childhood education and care department at the public employees retirement association building in Santa Fe in Santa Fe county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, furnish and equip infrastructure improvements at early childhood education and care department facilities statewide. The time of expenditure is extended through fiscal year 2027.
SECTION 394. GENERAL SERVICES DEPARTMENT STATE FACILITIES DEMOLITION AND DECOMMISSION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the capital program fund project originally authorized in Subsection 21 of Section 7 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 287 to decommission and demolish buildings, including abatement of hazardous materials, at state-owned facilities statewide, including facilities at the Los Lunas campus in Los Lunas in Valencia county and at the New Mexico behavioral health institute at Las Vegas in San Miguel county, is extended through fiscal year 2027.
SECTION 395. EXECUTIVE OFFICE BUILDING CONSTRUCTION--CHANGE TO STATEWIDE PROPERTY ACQUISITION--CHANGE AGENCY--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the general services department in Item (18) of Section 10 of Chapter 54 of Laws 2022 to plan, design, construct, furnish and equip, including demolition of existing structures, an executive office building in Santa Fe in Santa Fe county shall not be expended for the original purpose but is appropriated to the capital program fund to acquire property and to plan, design, construct, improve, furnish and equip buildings and property statewide. The time of expenditure is extended through fiscal year 2027.
SECTION 396. HARRIET SAMMONS BUILDING INFRASTRUCTURE IMPROVEMENT--CHANGE TO HEALTH CARE AUTHORITY FACILITY INFRASTRUCTURE IMPROVEMENT STATEWIDE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the capital program fund in Section 46 of Chapter 138 of Laws 2021 to plan, design, construct, renovate, equip, purchase and install infrastructure improvements, including roofing replacement, at the Harriet Sammons building in Farmington in San Juan county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, furnish and equip infrastructure improvements at health care authority facilities statewide. The time of expenditure is extended through fiscal year 2027.
SECTION 397. MAINSTREET AND ARTS AND CULTURAL DISTRICT INFRASTRUCTURE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the economic development department project in Subsection 2 of Section 16 of Chapter 138 of Laws 2021 to plan, design, construct and improve infrastructure in downtown mainstreet districts and in local arts and cultural districts statewide is extended through fiscal year 2027.
SECTION 398. PUBLIC EDUCATION DEPARTMENT SCHOOL BUS CAMERAS PURCHASE--EXTEND TIME--PUBLIC SCHOOL CAPITAL OUTLAY FUND.--The time of expenditure for the public education department project in Subsection 1 of Section 44 of Chapter 199 of Laws 2023 to purchase cameras for newly purchased to-and-from school buses is extended through fiscal year 2027.
SECTION 399. PUBLIC EDUCATION DEPARTMENT SCHOOL BUS REPLACEMENT--EXTEND TIME--PUBLIC SCHOOL CAPITAL OUTLAY FUND.--The time of expenditure for the public education department project in Subsection 2 of Section 44 of Chapter 199 of Laws 2023 to purchase district-owned, to-and-from school buses statewide is extended through fiscal year 2027.
SECTION 400. OFFICE OF THE STATE ENGINEER DAM REHABILITATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the office of the state engineer project in Subsection 5 of Section 20 of Chapter 138 of Laws 2021 to plan, design, construct, rehabilitate and make improvements to publicly owned dams statewide is extended through fiscal year 2027.
SECTION 401. VETERAN CEMETERIES AND MONUMENTS IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the capital program fund project originally authorized in Section 43 of Chapter 138 of Laws 2021 and reauthorized in Laws 2022, Chapter 52, Section 127 to plan, design, construct, improve, repair, furnish and equip and make improvements, including safety and security infrastructure, at veteran cemeteries and monuments statewide is extended through fiscal year 2027.
SECTION 402. LAND GRANT COUNCIL LAND ACQUISITION--CHANGE TO CRISTOBAL DE LA SERNA LAND GRANT-MERCED LAND ACQUISITION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 427 of Section 34 of Chapter 277 of Laws 2019 for the land grant council to acquire land within and for the Cristobal de la Serna land grant-merced in Taos county shall not be expended for the original purpose but is changed to acquire land for the Cristobal de la Serna land grant-merced in Taos county. The time of expenditure for the project is extended through fiscal year 2027.
SECTION 403. UNIVERSITY OF NEW MEXICO TAOS BRANCH CAMPUS HARWOOD MUSEUM INFRASTRUCTURE RENOVATION--CHANGE TO HARWOOD MUSEUM FACILITY INFRASTRUCTURE CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the board of regents of the university of New Mexico in Subsection 31 of Section 40 of Chapter 66 of Laws 2024 to plan, design, construct, renovate, purchase, install and equip infrastructure, including accessibility improvements, at the Harwood museum at the Taos branch campus of the university of New Mexico in Taos county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, purchase, install and equip infrastructure, including accessibility improvements, at multiple Harwood museum facilities at the Taos branch campus of the university of New Mexico in Taos county.
SECTION 404. CABRESTO ROAD PAVEMENT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 106 of Section 33 of Chapter 138 of Laws 2021 to plan, design and construct improvements to Cabresto road in Questa in Taos county is extended through fiscal year 2027.
SECTION 405. QUESTA INDEPENDENT SCHOOL DISTRICT SPORT UTILITY VEHICLE PURCHASE--CHANGE TO VEHICLE AND EQUIPMENT PURCHASE--GENERAL FUND.--The unexpended balance of the appropriation to the public education department in Subsection 225 of Section 16 of Chapter 66 of Laws 2024 to purchase and equip a student activities sport utility vehicle for the Questa independent school district in Taos county shall not be expended for the original purpose but is changed to purchase and equip heavy equipment and vehicles for the Questa independent school district in Taos county.
SECTION 406. TAOS REGIONAL AIRPORT ENTRANCE ROAD AND PARKING LOT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 357 of Section 29 of Chapter 138 of Laws 2021 and reauthorized in Laws 2022, Chapter 52, Section 146 to plan, design, construct and improve the entrance road and the parking lot at the Taos regional airport in Taos county is extended through fiscal year 2027.
SECTION 407. TAOS SKI VALLEY KACHINA WATER BOOSTER STATION CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the department of environment project originally authorized in Subsection 128 of Section 26 of Chapter 277 of Laws 2019 and reauthorized in Laws 2021, Chapter 139, Section 87 and again in Laws 2023, Chapter 203, Section 299 to plan, design, construct and equip a water booster station to provide water to the Kachina water tank and to install corresponding distribution network infrastructure to serve Taos Ski Valley in Taos county is extended through fiscal year 2027.
SECTION 408. TAOS PUEBLO SENIOR DAYCARE FACILITY CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the aging and long-term services department project originally authorized in Subsection 69 of Section 4 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 298 to acquire easements and rights of way for and to plan, design, construct and equip a senior daycare facility in the Pueblo of Taos in Taos county is extended through fiscal year 2017.
SECTION 409. TAOS SKI VALLEY WATER BOOSTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 97 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct, equip and install a water booster station for a water tank for Taos Ski Valley in Taos county is extended through fiscal year 2027.
SECTION 410. CLAUNCH-PINTO SOIL AND WATER CONSERVATION DISTRICT HEAVY EQUIPMENT PURCHASE--CHANGE TO TRUCK PURCHASE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the board of regents of New Mexico state university in Subsection 29 of Section 38 of Chapter 199 of Laws 2023 to purchase and equip heavy equipment, including a skid steer with attachments and a trailer, for the Claunch-Pinto soil and water conservation district in Torrance county shall not be expended for the original purpose but is changed to purchase and equip trucks for the Claunch-Pinto soil and water conservation district in Torrance county. The time of expenditure is extended through fiscal year 2027.
SECTION 411. TORRANCE COUNTY ADMINISTRATIVE BUILDING CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 360 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, equip and furnish a county administrative building in Torrance county is extended through fiscal year 2027.
SECTION 412. TORRANCE COUNTY FAIRGROUNDS IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 361 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, improve, furnish and equip the county fairgrounds in Torrance county is extended through fiscal year 2027.
SECTION 413. MOUNTAINAIR PUBLIC SCHOOL DISTRICT ACCESSIBLE ACTIVITY BUS PURCHASE--CHANGE TO PURCHASE AN ACTIVITY BUS--EXTEND TIME--GENERAL FUND.--The public education department project in Subsection 211 of Section 16 of Chapter 199 of Laws 2023 to purchase and equip an activity bus with wheelchair lift capabilities for the Mountainair public school district in Torrance county shall not be expended for the original purpose but is changed to purchase and equip an activity bus for the Mountainair public school district. The time of expenditure is extended through fiscal year 2027.
SECTION 414. MORIARTY AMBULANCE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 485 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip an ambulance for the Moriarty police and fire departments in Moriarty in Torrance county is extended through fiscal year 2027.
SECTION 415. MORIARTY POLICE VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 486 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip police vehicles in Moriarty in Torrance county is extended through fiscal year 2027.
SECTION 416. MORIARTY SENIOR CENTER RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 57 of Section 5 of Chapter 138 of Laws 2021 for renovations to the Moriarty senior center in Torrance county is extended through fiscal year 2027.
SECTION 417. BELEN SEWER LINES WEST ARAGON ROAD IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 104 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct, replace and improve sewer lines along west Aragon road in Belen in Valencia county is extended through fiscal year 2027.
SECTION 418. DON LUIS TRUJILLO BOULEVARD CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 111 of Section 33 of Chapter 138 of Laws 2021 to plan, design, construct and improve Don Luis Trujillo boulevard in Belen in Valencia county is extended through fiscal year 2027.
SECTION 419. BOSQUE FARMS FIRE AND POLICE DEPARTMENTS IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 375 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, equip and install improvements to the fire and police departments in Bosque Farms in Valencia county is extended through fiscal year 2027.
SECTION 420. BOSQUE FARMS WASTEWATER TREATMENT SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 105 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct, equip and install improvements to the wastewater treatment system, including clarifier and sludge processing, for Bosque Farms in Valencia county is extended through fiscal year 2027.
SECTION 421. VALENCIA COUNTY ADMINISTRATION BUILDING IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 380 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, renovate, equip and install improvements, including a fire alarm and sprinkler system, upgrades to electrical, plumbing, heating, ventilation and air conditioning systems, furnishings and accessibility improvements, to the county administration building in Los Lunas in Valencia county is extended through fiscal year 2027.
SECTION 422. PERALTA FIRE STATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 384 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct a fire station in Peralta in Valencia county is extended through fiscal year 2027.
SECTION 423. COLUMBUS HEALTH COMPLEX IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 237 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, improve, equip and furnish a health and wellness community complex for Columbus in Luna county is extended through fiscal year 2027.
SECTION 424. MALAGA MUTUAL DOMESTIC WATER CONSUMERS AND SEWAGE WORKS ASSOCIATION BACKHOE PURCHASE--CHANGE TO VACUUM TRAILER PURCHASE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 252 of Section 28 of Chapter 199 of Laws 2023 to purchase and equip a backhoe for the Malaga mutual domestic water consumers and sewage works association in Eddy county shall not be expended for the original purpose but is changed to purchase and equip a vacuum trailer for the Malaga mutual domestic water consumers and sewage works association in Eddy county. The time of expenditure is extended through fiscal year 2027.
SECTION 425. TOADLENA/TWO GREY HILLS CHAPTER SENIOR CENTER IMPROVEMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the aging and long-term services department project originally authorized in Subsection 47 of Section 4 of Chapter 277 of Laws 2019 and reauthorized in Laws 2023, Chapter 203, Section 213 to plan, design, construct, purchase, furnish, equip and install improvements, including heating, ventilation and air conditioning systems, electrical systems and accessibility, to the senior center in the Toadlena/Two Grey Hills chapter of the Navajo Nation in San Juan county is extended through fiscal year 2027.
SECTION 426. EMERGENCY.--It is necessary for the public peace, health and safety that this act take effect immediately.
- 153 -